The City of Hastings is soliciting bids for the design‑build of a new pre‑engineered metal aircraft hangar (approximately 4,500 GSF) and an adjacent concrete apron at Hastings Municipal Airport. The scope covers site preparation, demolition of existing pavement, earthwork, foundation and structural steel erection, full electrical service installation, utility relocations, erosion‑control measures, and phased construction to maintain airport operations. The contractor must comply with extensive FAA, FAA‑regional, and state safety requirements, including NOTAM issuance, One‑Call utility notifications, wildlife management, and strict gate‑security penalties.
• New 4,500 GSF pre‑engineered metal hangar with 70 × 20 ft door, interior lighting, HVAC, and fire‑extinguisher system (S‑1 occupancy).
• Construction of a concrete apron, footings, pilasters, grade beams, stem walls, and a 6‑in. slab‑on‑grade foundation.
• Full electrical service (meter, transformer, panelboards, lighting, grounding) and new water service line.
• Required coordination with FAA (NOTAM, equipment > 75 ft, navaid shutdown), Nebraska One‑Call, utility owners, and airport operator; daily FOD and wildlife control; phased work to keep runways/taxiways open.
• Safety‑phasing plan includes erosion‑control, temporary staging, barricades, and mandatory gate‑security ( $200 fine per violation).