The City of Prescott is seeking a qualified contractor to design and construct a four‑unit, 16,315 sq ft pre‑engineered steel executive hangar (Phase 1) at the Prescott Regional Airport, including civil site work, utilities, a taxi lane, security fencing, and an aircraft wash rack with associated water and drainage improvements. The project must be completed within 262 calendar days from notice to proceed, with a bid opening on December 10 2026 and anticipated award on January 5 2027. Funding is primarily from FAA Airport Entitlements and IIJA grants, supplemented by ADOT and local match. Bids are submitted electronically via OpenGov; questions are due by December 1 2026. The City will award the contract after Council approval and will require standard insurance, bonds, and compliance with federal and state regulations.
• 4‑unit, 16,315 sq ft pre‑engineered metal hangar (performance‑spec)
• Civil site improvements: grading, drainage, utilities, taxi lane, fencing
• Concrete aircraft wash rack with water/ sewer upgrades
• Fire suppression system, oil‑water separator, interior floor drains
• Project budget funded by FAA, IIJA, ADOT, and local match
• Bid opening: Dec 10 2026 2:00 pm; award anticipated Jan 5 2027
• Construction period: 262 days (≈ 8.5 months)
• Mandatory insurance, bonding, and licensing requirements.