Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • How to answer an RFIRFI Meaning: What Is an RFI?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›SITE Domestic Water Valve Replacements Phase 2, NIST…

U.S. Department Of Commerce·Maryland

SITE Domestic Water Valve Replacements Phase 2, NIST, Boulder, CO

Closes 5/18/2026$200k – $500kRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The National Institute of Standards & Technology (NIST) is seeking information from potential sources capable of performing work on a commercial contract at the NIST Boulder, Colorado Campus Site. The project involves removing and replacing domestic water piping and valves, including approximately 350 linear feet of existing 6-inch cast iron domestic water piping and replacing it with PVC piping. The work also includes the removal and replacement of one 6-inch fire hydrant valve, one 6-inch water main valve, and one 6-inch branch valve. Interested and capable sources are requested to electronically submit a Capabilities Statement with supporting supplemental data. Some key points to consider include: • The project location is at the NIST Boulder Campus, specifically the Daycare center lawn, Building 26 to the front of Building 3 main entrance sidewalk. • The period of performance for this work is 180 calendar days from Notice to Proceed (NTP). • The contractor shall provide all labor, materials, equipment, supervision, and transportation necessary to perform demolition, installation, testing, and restoration associated with the replacement of an existing water main and associated components. • The contractor shall verify all existing site conditions and utility locations prior to beginning excavation activities. • The contractor shall provide a detailed, site-specific Safety Plan to the contracting officer within 10 days after award. • The contractor shall provide all safety-related equipment required to perform the work under this award, including personal protective equipment (PPE) and other equipment that is required or appropriate to protect contractor personnel and other personnel on the NIST campus.

Attached files

Contact

Shawn Borisow

[email protected]

Key dates

Opened
4/29/2026
Closes
5/18/2026
Duration
180 days

Last updated

Details

Type
Request for Information
Industry
Civil Engineering
NAICS
237110
Solicitation №
NB194000-26-01244

Budget estimate

$200,000 – $500,000

The budget for this project can be estimated based on the scope of work, which includes the removal and replacement of approximately 350 linear feet of existing 6-inch cast iron domestic water piping and the installation of new PVC piping, as well as the removal and replacement of one 6-inch fire hydrant valve, one 6-inch water main valve, and one 6-inch branch valve. Considering the materials and labor required for the project, a rough estimate for the budget could be between $200,000 and $500,000. This estimate may be influenced by factors such as the cost of materials, labor costs, and any additional requirements or complexities that may arise during the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Richland·Washington

Top match · 72%

Water Treatment Plant Filter Bay Valve Replacement

Closes 11/3/2026Opened 9/27/2026

Norton Housing Authority·Massachusetts

70% match

Tub Surround & Shower Valve Replacement REBID

Closes 11/4/2026Opened 10/7/2026

Washington Suburban Sanitary Commission, MD·Maryland

70% match

Penn Manor Large Valve Vault Replacement

Closes 11/16/2026Opened 10/15/2026

Washington Suburban Sanitary Commission·Maryland

70% match

Penn Manor Large Valve Vault Replacement

Closes 11/16/2026Opened 10/19/2026

Nevada Department of Human Services·Nevada

70% match

Water Well Repair

Closes 11/3/2026Opened 10/20/2026

Bristol Virginia Utilities Authority·Virginia

70% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026

Maryland Frederick County Government·Maryland

69% match

IFB #27-121-CP Water Distribution Improvements Phase II

Closes 11/10/2026Opened 9/10/2026

U.S. Department Of Defense·United States of America

69% match

STEM,FLUID VALVE

Closes 11/23/2026Opened 10/26/2026

City of Bellevue·Washington

69% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

69% match

16--VALVE,LNDGR ISOLTN,, IN REPAIR/MODIFICATION OF

Closes 11/22/2026Opened 10/8/2026

Santa Clara Valley Water District·California

69% match

San Francisco Intertie Valves and Joints

Closes 11/12/2026Opened 8/18/2026

City of Charlotte·North Carolina

69% match

McDowell Knife Gate Valve

Rolling / TBD closeOpened 11/15/2025

U.S. Department Of Defense·Washington

69% match

NAVIGATION LOCK TAINTER VALVE (TV) REPAIR, TV1

Closes 11/30/2026Opened 10/27/2026

Town of Manchester·Connecticut

69% match

FURNISH AND INSTALL INSERTS FOR SIPHONS 1 & 3 AT GLOBE HOLLOW WATER TREATMENT FACILITY

Closes 11/17/2026Opened 10/20/2026

U.S. Department Of Agriculture·Utah

68% match

Ross Springs Waterline Replacement

Closes 11/21/2026Opened 10/22/2026

U.S. Department Of Defense·California

68% match

16--VALVE,ECS, IN REPAIR/MODIFICATION OF

Closes 11/23/2026Opened 10/23/2026

U.S. Department Of Veterans Affairs·North Carolina

68% match

Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009)

Closes 12/2/2026Opened 10/23/2026

Massachusetts Town of Middleborough·Massachusetts

68% match

WPCF Secondary Clarifier Gate Replacement, Project#22054

Closes 11/19/2026Opened 10/23/2026

Santa Clara Valley Water District·California

68% match

Pacheco Pumping Plant Pump 12 Rebuild

Closes 12/8/2026Opened 10/20/2026

Massachusetts Town of Westborough·Massachusetts

68% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

City of Beaumont·California

68% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

68% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

City of Redlands·California

68% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

U.S. Department Of Defense·Oregon

68% match

JOHN DAY DAM NAVIGATION LOCK TAINTER VALVE (TV) REPAIRS TV3 AND TV4

Closes 11/19/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

68% match

48--VALVE,LINEAR,DIRECT

Closes 11/22/2026Opened 10/8/2026