Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Alabama guideAlabama Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Alabama
  4. ›Water and Wastewater
  5. ›Bid - Mercedes Force Main Phase 3 Construction

City of Tuscaloosa Water and Sewer Department·Alabama

Bid - Mercedes Force Main Phase 3 Construction

Closes 7/28/2026$1.2M – $2.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Tuscaloosa is seeking bids for the Phase 3 replacement of a force‑main segment within its municipal water‑sewer system. The scope involves removing an existing 3,350 ft of 16‑in. DI pipe and installing a new 20‑in. HDPE pipe, adding four air‑release valve assemblies, and constructing a 5,700 ft temporary bypass using 12‑in. HDPE. Contractors must handle pipe removal, HDPE welding, valve installation, testing, erosion control, and coordination with city utilities. • Replace 3,350 ft of 16‑in. DI force main with 20‑in. HDPE; include 4 air‑release valves. • Install 5,700 ft of 12‑in. HDPE temporary bypass force main. • Perform testing, erosion control, and install required appurtenances; all work confined to Tuscaloosa, AL. • Mandatory pre‑bid conference on July 21, 2026; bid submission deadline July 28, 2026. • Plans available for free electronic download; hard copies require $250 refundable deposit.

Attached files

Contact

Doug Varnon(Project Engineer)

[email protected]

Key dates

Opened
8/18/2026
Pre-bid meeting
7/21/2026Mandatory
Closes
7/28/2026
Projected award
9/26/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
OCA‑26‑0781 W & S

Budget estimate

$1,200,000 – $2,500,000

The project involves extensive HDPE pipe work, valve installation, and testing. Based on industry benchmarks for HDPE force‑main replacement (roughly $150‑$250 per linear foot for large‑diameter pipe) and additional temporary bypass construction, a realistic contract value falls between $1.2 million and $2.5 million. Factors influencing the range include material costs, labor rates, site‑specific erosion control measures, and the complexity of valve assembly installation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Louisiana City of Baton Rouge and Parish of East Baton Rouge (Greater Baton Rouge Airport District)·Louisiana

Top match · 72%

Runway 13/31 Safety Area & RPZ Improvements - Phase III Demolition

Closes 11/17/2026Opened 10/13/2026

City of Port Arthur·Texas

71% match

3RD AVENUE LIFT STATION PROJECT

Closes 11/4/2026Opened 10/13/2025

North Carolina City of Raleigh·North Carolina

70% match

Wake BRT New Bern Avenue Construction Package 3

Closes 11/16/2026Opened 9/25/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

70% match

Runway 13/31 Safety Area & RPZ Improvements - Phase III Demolition

Closes 11/17/2026Opened 10/16/2026

City of Lowell·Massachusetts

70% match

Saint Louis Park Phase 2, addenda 3 issued

Closes 11/4/2026Opened 10/7/2026

City of Napa·California

70% match

Citywide Striping - Phase 3

Closes 11/16/2026Opened 10/27/2026

City of Cincinnati·Ohio

70% match

Traffic Signals Contract No.3

Closes 11/6/2026Opened 10/10/2026

City of Creve Coeur·Missouri

70% match

New Ballas Sidewalk Project - Phase 3

Closes 11/19/2026Opened 10/9/2026

City of Tustin·California

70% match

Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)

Closes 12/10/2026Opened 10/28/2026

Washington Metropolitan Area Transit Authority (WMATA)·District of Columbia

70% match

FRSMP277009/JLM-Lighting Phase 2

Closes 12/2/2026Opened 10/23/2026

State University of New York (SUNY)·New York

70% match

Pine Bush Renovation Phase 3

Closes 11/24/2026Opened 10/27/2026

Jefferson Parish Government·Louisiana

70% match

Bid Event #268 - WEST ESPLANADE AVENUE U-TURN NEAR EDENBORN AVENUE - JEFFERSON PARISH PROJECT NO. 2022-017-DR

Closes 12/15/2026Opened 10/21/2026

Jefferson Parish Government·Louisiana

69% match

Bid Event # 185 - JEFFERSON PARISH WATERLINE IMPROVEMENTS SOUTH NEW ORLEANS SUBDIVISION JEFFERSON PARISH PROJECT NO. 2023-028-WRB

Closes 11/17/2026Opened 10/7/2026

Ohio City of Westerville·Ohio

69% match

Brooksedge Area Mobility Improvements, PH 2 & 3

Closes 11/4/2026Opened 10/7/2026

Town of Bluffton·South Carolina

69% match

Pathway Pedestrian Improvements Phase 3

Closes 11/12/2026Opened 10/13/2026

City of Port Arthur·Texas

69% match

3RD AVENUE LIFT STATION PROJECT

Closes 11/4/2026Opened 10/13/2026

U.S. Department Of Defense·South Carolina

69% match

PSTE 162013 Repair and Widen Taxiways, Phase III

Closes 1/29/2027Opened 1/29/2026

Texas City of San Antonio·Texas

68% match

Texas A&M University Area Streets (Maria Ferrier Ave. to Mauermann Road) Phase 2 (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

City of Cleburne·Texas

68% match

Bid No. 26-14 Thunderbay Lift Station and Force Main

Closes 11/6/2026Opened 10/10/2026

NYC Department of Citywide Administrative Services·New York

68% match

Bid Extension: 85625B0011-CSB General Construction RC Man. & Bronx

Closes 12/9/2026Opened 8/27/2026

City of San Antonio·Texas

68% match

Vance Jackson (Loop 410 to Adrian Drive) (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

City of Carrollton·Texas

68% match

Frankford Road Reconstruction Seg 3

Closes 12/2/2026Opened 10/26/2026

City of Des Moines - Iowa·Iowa

68% match

WRA Joint Trunk – Phase 14, Segment 3

Closes 12/1/2026Opened 10/21/2026

City of Charlotte·North Carolina

68% match

Runway 18/36 and Taxiway Delta Rehab Construction

Rolling / TBD closeOpened 12/14/2026

Georgia City of Valdosta·Georgia

68% match

Stallings Lift Station & Force Main Improvements

Closes 11/5/2026Opened 8/11/2026