Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Utah guideUtah Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Utah
  4. ›Construction
  5. ›Remodeling at the WSU Wattis Building Dean's Area

Weber State University·Utah

Remodeling at the WSU Wattis Building Dean's Area

Closes 10/5/2026$150k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The University is seeking a qualified contractor to fully remodel the Dean’s area within the Wattis Building. The work includes interior demolition, wall repair and painting, ceiling tile replacement, installation of new metal storefront doors with electronic access hardware, provision of new electrical outlets, addition of cabinetry, wood paneling, glass whiteboards, and artwork placement. All work must meet university specifications, include required bonding and insurance, and be completed by the substantial‑completion date. • Demolition of existing finishes, removal of pictures, signs, vinyl decals, and door hardware. • Installation of new doors (metal storefront) with electronic access preparation (161L NDE series). • Interior finishes: patch walls, paint with Sherwin‑Williams “Mindful Gray,” replace ceiling tiles where needed. • Electrical: install 26 standard 110 V outlets on 7 circuits, surface‑mount or recessed as indicated. • Dean’s conference room upgrades: new lower cabinet with mini‑fridge space, wood panels, glass whiteboards, and artwork mounting. • Mandatory pre‑bid meeting on 9/24/2026; 5 % bid bond required; performance and payment bonds required before work commences.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Richard Badger(Purchasing Contact)

[email protected]

(801) 626-6021

Key dates

Opened
9/21/2026
Pre-bid meeting
9/24/2026Mandatory
Closes
10/5/2026
Duration
4 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
Q221025451-2026

Budget estimate

$150,000 – $500,000

No budget is disclosed in the solicitation documents. Based on comparable university interior remodels of a similarly sized dean’s office (≈5,000–7,000 sq ft) in Utah, a typical contract value ranges from $150,000 to $500,000 depending on finish quality, hardware selections, and contingency allowances. The estimate assumes moderate‑grade finishes, standard metal storefront doors, and the electrical/fixture scope described.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Wright State University - Design and Construction·Ohio

Top match · 70%

WSU25-0088 Paul Laurance Dunbar Vestibule and Concrete Replacement

Closes 11/23/2026Opened 10/27/2026

Grayson College·Texas

68% match

Grayson College - New Maintenance Facility & Existing Health Science Renovations

Closes 11/5/2026Opened 10/9/2026

University of North Dakota·North Dakota

67% match

UND School of Medicine & Health Sciences Student Affairs Renovation

Closes 11/10/2026Opened 10/13/2026

Michigan Marysville Public Schools·Michigan

67% match

District Wide Remodeling Projects

Closes 11/5/2026Opened 10/27/2026

East Tennessee State University·Tennessee

67% match

COM Bldg 2 Learning Community Renovation

Closes 10/31/2026Opened 9/10/2026

Columbus State Community College·Ohio

66% match

CSCC WD-1 Annex Major Renovation

Closes 11/10/2026Opened 10/20/2026

Michigan Whitehall District Schools·Michigan

66% match

WDS Bond Proposal Phase 1- Ealy, Middle School, Shoreline

Closes 11/10/2026Opened 10/26/2026

Iowa State University·Iowa

66% match

CP1321285‑Reiman Gardens Storage Building and Maintenance Building Addition

Closes 11/5/2026Opened 10/8/2026

Northeast Wisconsin Technical College·Wisconsin

65% match

DO_CO and AG_SC Comp

Closes 11/24/2026Opened 10/28/2026

The University of North Carolina·North Carolina

65% match

George Watts Hill Alumni Center - Addition and Renovation

Closes 11/19/2026Opened 10/6/2026

Massachusetts Newton Housing Authority·Massachusetts

65% match

Window, siding and door replacements and associated work at 27 Kerry Court

Closes 11/19/2026Opened 10/21/2026

West Virginia State University·West Virginia

65% match

WVSU STUDENT UNION-ROOF REPLACEMENT

Closes 11/12/2026Opened 10/22/2026

Michigan Memphis Community Schools·Michigan

65% match

District Wide Renovations

Closes 11/16/2026Opened 10/19/2026

Iowa City·Iowa

65% match

2003 & 2005 Taylor Dr. Rehab Project

Closes 11/4/2026Opened 10/5/2026

The University of North Carolina·North Carolina

65% match

Roof Repairs Phase 3 – College of Veterinary Medicine Main Building

Closes 11/17/2026Opened 8/18/2026

Iowa State University·Iowa

65% match

CP1275129-Linden Residence Hall-North Retaining Wall-Repairs

Closes 11/12/2026Opened 10/15/2026

The University of North Carolina·North Carolina

65% match

Jordan Hall HVAC Renovations

Closes 12/3/2026Opened 1/3/2025

Iowa Department of Administrative Services·Iowa

65% match

WRC Dispatch Garage Roof Replacement & Birches Tuckpointing

Closes 11/10/2026Opened 10/12/2026

City of Seattle·Washington

65% match

Dahl Restroom Renovation

Closes 11/4/2026Opened 10/7/2026

Iowa Department of Administrative Services·Iowa

65% match

WRC Dispatch Garage Roof Replacement & Birches Tuckpointing

Closes 11/10/2026Opened 10/12/2026

Ouachita Parish School Board·Louisiana

65% match

10-27 WMHS Restroom Renovations

Closes 11/5/2026Opened 10/8/2026

Austin Peay State University·Tennessee

65% match

Amendment 2 26-05-001 RFP (27-001) Residential Multi-Family Housing

Closes 1/5/2027Opened 6/1/2026

University of South Carolina·South Carolina

65% match

Russell House Student Union Expansion and Renovation

Closes 11/18/2026Opened 10/29/2026

Fox Valley Technical College·Wisconsin

65% match

Restroom Remodel – Entrance #10

Closes 11/2/2026Opened 10/7/2026

School District of Philadelphia (Capital Opportunities)·Pennsylvania

65% match

WELLNESS CENTER RENOVATIONS (MC)atOLNEY HIGHLocated at100 W DUNCANNON AVEPHILADELPHIA PA 19120

Closes 11/5/2026Opened 10/8/2026