The University of Minnesota is seeking a qualified firm to provide asbestos indoor air monitoring, sample collection, on‑site analysis, and reporting for the St. Paul Campus Center (SPCC) abatement project. The work includes daily monitoring logs, bulk sampling, visual inspections, and final reporting over an estimated 16‑week period. Respondents must hold Minnesota asbestos contractor licenses and AIHA/AAR certifications, and must submit detailed personnel qualifications, hourly rates, and expense estimates via the MBid system. The contract will be awarded to the most advantageous, responsive, and responsible proposal, with cost weighted at 70 % of the evaluation.
• Project site: Magrath Library, 1984 Buford Ave, St. Paul, MN 55108
• Scope: Air sampling, on‑site analysis, daily logs, bulk sampling, visual inspections, final reports
• Timeline: Pre‑proposal site visit 9/22/2026 (non‑mandatory); proposal due 10/6/2026 2 PM; work expected mid‑Oct 2026 to Feb 1 2027 (≈16 weeks)
• Mandatory qualifications: MN Asbestos Abatement Contractor license; AIHA accreditation; MDH Asbestos Site Supervisor and Analyst certifications for staff
• Submission: Electronic only through MBid; include all required attachments, personnel resumes, certifications, and cost breakdowns
• Evaluation: 30 % staff experience/availability, 70 % cost
• Contact: Kevin Sullivan (
[email protected])