Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›MIA Gate D15 Grease Trap Replacement

Miami-Dade County·Florida

MIA Gate D15 Grease Trap Replacement

Closes 12/17/2025
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Scope of Work shall include, but not be limited to: Provide all labor, equipment and materials for the demolition of the existing grease interceptor located at MIA Gate D15 and replacement with a new hydromechanical grease interceptor, solids separator, and sampling port, along with associated electrical and plumbing work and pavement restoration. CONTRACTOR shall review all documents, specifications, and scope of work provided by Miami-Dade Aviation Department (MDAD) for work to be completed. Please refer to the Plans for further description of the scope of work. Contractors must agree to perform all work in accordance with the scopes of work established by MDAD, the MCC 7360 contract’s terms and conditions, all required permits and inspections and all applicable federal, state and local laws, codes and regulations. For the MCC 7360 General Contract Conditions, refer to the following link: https://intrax.miamidade.gov/ciis/STANDARD_CONSTRUCTION_GENERAL_CONTRACT_CONDITIONS_REVISED_7_1_2024.pdf Any minor variation in the scope of work that is necessary to complete the intended work shall be considered incidental and will not warrant additional compensation. Any major variation encountered in the scope of work that is necessary to complete the intended work will be additional work and will be compensated through a contingency allowance account, dedicated allowance account, or change order. However, such major variation shall be completed without delay. Contractor shall use an adequate number of qualified workers who are thoroughly trained in the techniques required to properly complete the work specified. Contractor will own or have access to the equipment necessary and to meet all safety, insurance, and technical requirements of the owner and local, county, state, and federal regulating authorities. The grand total bid price shall be reflected on the RPQ Bid Form – Attachment 5A. LICENSE: Note: Pursuant to the requirements of Section 10-3 of the Code of Miami-Dade County, selected Contractors must possess a valid, current, and active State of Florida and/or Miami-Dade County contractor’s license issued by the County's Construction Trades Qualifying Board and which is consistent with the requirements of their respective trade and the scope of work. REQUEST FOR INFORMATION: All requests for information (RFIs) shall comply with the Cone of Silence, Administrative Order 3-27 and shall be directed in writing to the MDAD project manager with a copy to the Clerk of the Board ([email protected]). The deadline to submit RFIs is no later than five (5) working days before the bid opening date and time specified on the RPQ and Invitation to Bid. MDAD will issue all changes and/or clarifications to the RPQ in writing via an Addendum. Verbal statements made by the County or the Owner’s Representative that are not contained in the RPQ or Addendum are not binding on the County and do not form any basis for a bidder’s response to a RPQ. MINIMUM QUALIFICATIONS AND EXPERIENCE: The selected contractor must possess: 1. Contractors must hold a valid license required to perform work in the following trade: General Contractor License. 2. As per Resolution No. R-1122-21, Contractors must have a minimum of 5 years’ experience performing work in their specific trade. In the event a new firm is established by executives, supervisors and other senior field staff (key employees) that would have met these minimum experience requirements with a prior firm, MDAD reserves the right to qualify the new firm, based on MDAD’s sole determination and evaluation of the knowledge and prior experience of these key employees employed by the new firm. 3. Contractors must be able to demonstrate that their firm or its key employees, as described above, have experience performing their respective trade within the company’s noted history. Specifically contractors must submit proof that their respective firms have been regularly and successfully engaged in work related to their specific trade for a minimum of one (1) year. These requirements shall be based on projects completed prior to the submission date. Contact information for projects and/or firms submitted as proof of experience shall be provided by prospective contractors as part of their bid package. MDAD will confirm the listed experience by calling the firms’ owners or representatives. Should such evidence not be satisfactory to MDAD, whose decision shall be final, the submission will be considered non-responsive. The qualifying proof with names and phone numbers shall be submitted in a sealed envelope at the time of bid. 4. Contractors must have a minimum average total score of 3.0 in their Contractor Performance Evaluations in ISD’s Capital Improvements Information System (CIIS). In the event a new firm has been created that does not have evaluations in the CIIS, the firm that previously employed the key employees of the new firm must have had a minimum average total score of 3.0 in the CIIS Contractor Performance Evaluation Module or the new firm must provide, to MDAD’s satisfaction, documentation that the new firm has performed satisfactorily on similar projects within their respective trade. Further, any incidence of project delays in a contractor performance evaluation must be justified to the satisfaction of MDAD. 5. Without limiting the generality of the foregoing, the County may determine that it is in the County's best interest to award the Contract to the next low bidder when the low bidder's existing contractual commitments with the County, in the sole discretion of the County (a) could prevent the timely prosecution of the work requiring competing commitments of site, supervisory or home office personnel, or (b) could present potential conflicts with billing of similar items under existing contracts for similar or related work, or (c) could disfavor competition in the contracting industry in pricing or in the use of personnel or subcontractors. MANDATORY PRE-BID MEETING & SITE VISIT: Since a conference call does not require a physical presence, social distancing practices for COVID-19 are being adhered to. Bidders are still required/responsible for participating in the MANDATORY conference call. Failure to participate in the MANDATORY conference call shall result in the corresponding contractor/company being considered non-responsive. Contractors are extremely encouraged to call 5 minutes before the scheduled meeting time for a roll call. Late arrivals to the conference call shall result in the contractor/company being considered non-responsive. The conference call will be recorded. The dial-in instructions for the conference call are described below: • Dial in: 305-876-8333 • Meeting ID: 5762555 • Passcode/Pin: 5869 The agenda for the pre-bid conference call meeting will be sent to you via email to be used during the meeting. Make sure you receive it, if not, please check your junk email or contact our office. Bidders are responsible for attending the mandatory pre-bid meeting conference call and site visit. BID BOX: The bid box is located in the hallway between Conference Rooms B-205 and B-209 in MIA Bldg. 3030, B-Wing, 2nd Floor. If the time clock adjacent to the bid box is unable to stamp the bid envelope due to its thickness, please see Ms. Silvia Perez, Mr. James P. Ferreira or any MDAD representative at MIA Building 3030 to have bid envelopes signed, dated and timed prior to dropping them in the box. BID SUBMITTAL: All potential bidders are hereby notified that bids for this project must reflect a lump sum amount. The lump sum amount shall be indicated on the MCC-7360 Attachment 5A Bid Form. All quantities provided with the bid documents are estimated quantities based on the project scope of work. It is the bidder's responsibility to confirm any and all estimated quantities or amounts reflected on the bid documents to generate a "responsive and responsible" bid. Errors, omissions, and/or discrepancies in quantities shall be brought-up to the attention of the MDAD team via the request for information (RFI) process during the bidding phase. Failure to confirm estimated quantities shall not constitute grounds for subsequent change orders. The lump sum bid amount shall be all inclusive to complete the work scope reflected on the construction bid documents. Bidders are responsible for all costs related to permitting, preparation of required shop drawings, special inspections, preparation of as-built drawings, close-out documentation and/or any engineering certificates required. Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
11/13/2025
Closes
12/17/2025

Last updated

Details

Industry
Construction
NAICS
238220

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Gwinnett County Government·Georgia

Top match · 63%

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

U.S. Department Of Agriculture·Colorado

63% match

Stove Prairie Campground Gate Replacement

Closes 11/11/2026Opened 10/20/2026

Indiana FSSA Disability & Rehab Svcs·Indiana

61% match

00497 IGCS Hot Dog Grill Replacement

Closes 11/6/2026Opened 9/26/2026

Ohio·Ohio

61% match

Inner Sally Port Gate Repair

Closes 11/5/2026Opened 10/21/2026

U.S. Department Of State·United States of America

61% match

Sliding Gate Safety Deficiencies Remediation

Closes 12/31/2026Opened 7/16/2026

Pittsburgh Regional Transit·Pennsylvania

61% match

Q261179 (Highway Crossing Gate Mechanism)

Closes 11/17/2026Opened 10/29/2026

Gwinnett County Government·Georgia

61% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

Nottoway Correctional Center·Virginia

60% match

Service To Provide Pumping, Removing of Grease from Nottoway Correctional Center & Work Center

Closes 9/29/2027Opened 10/13/2026

Wyoming Department of Transportation·Wyoming

60% match

GENERATOR REPLACEMENT

Closes 11/10/2026Opened 10/9/2026

U.S. Department Of Defense·Oregon

60% match

W9127N27BA005 Foster Spillway Gate Nut Replacements and Re-Tensioning

Closes 11/5/2026Opened 10/21/2026

Hawaii Department of Business, Economic Development and Tourism·Hawaii

60% match

Replacement of Kolowalu Dog Park Entry/Exit Gates

Closes 11/10/2026Opened 10/29/2026

California Department of Corrections and Rehabilitation·California

60% match

C5613433-D Grease Trap and Septic Tank Pumping Services

Closes 11/2/2026Opened 9/21/2026

Gwinnett County Government·Georgia

60% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

California Military Department·California

60% match

IFB No.133885 Fence and Gate Repair - Multiple Locations, Multiple Locations

Closes 11/17/2026Opened 10/26/2026

Massachusetts Town of Middleborough·Massachusetts

60% match

WPCF Secondary Clarifier Gate Replacement, Project#22054

Closes 11/19/2026Opened 10/23/2026

Georgia Gwinnett County·Georgia

60% match

BL152-26, Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

U.S. Department Of Justice·Colorado

60% match

FCC FLORENCE QUARTERLY GREASE TRAP CLEANING

Closes 11/9/2026Opened 10/29/2026

U.S. Department Of The Interior·Utah

60% match

56--PGMB Security Gate

Closes 11/23/2026Opened 10/19/2026

Gwinnett County Government·Georgia

60% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

South Carolina Forestry Comm·South Carolina

60% match

FARM GATE REPAIR- SUMTER NATIONAL FOREST

Closes 11/3/2026Opened 10/7/2026

Alabama State Port Authority·Alabama

59% match

RFP – C19/C20 Gearbox Replacements

Closes 11/9/2026Opened 10/23/2026

Gwinnett County Government·Georgia

59% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

Port of Tacoma·Washington

59% match

TOTE Terminal Pavement Maintenance and Repair (2026)

Closes 11/17/2026Opened 10/31/2026

California Highway Patrol·California

59% match

GATE AND BAY DOOR MAINTENANCE - IFB 26C680002

Closes 11/24/2026Opened 10/29/2026

Iowa Department of Transportation·Iowa

59% match

Iowa DOT Repair Shop Annex Overhead Door Tracks

Closes 11/10/2026Opened 10/27/2026