Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›GIWW, Freeport to Matagorda Bay Pipeline Dredging…

U.S. Department Of Defense·Texas

GIWW, Freeport to Matagorda Bay Pipeline Dredging, Brazoria, Matagorda, and Calhoun Counties, Texas

Closes 11/6/2025$10M – $50MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The US Army Engineer District Galveston is soliciting bids for the GIWW, Freeport to Matagorda Bay Pipeline Dredging project in Brazoria, Matagorda, and Calhoun Counties, Texas. The project involves dredging the Gulf Intracoastal Waterway (GIWW) and other channels to maintain navigation depths. The contractor will be responsible for mobilizing and demobilizing equipment, dredging, and disposing of dredged material. • The project includes multiple bid items for dredging different sections of the GIWW and other channels. • The contractor will be paid based on the quantity of material dredged, with payments made on a monthly basis. • The government will perform electronic surveys to determine the quantity of material dredged and to verify the contractor's work. • The contractor must comply with all applicable laws and regulations, including those related to environmental protection and safety.

Attached files

Contact

Danelle Tate(Contracting Officer)

[email protected]

(409) 766-3116

Key dates

Opened
9/25/2025
Closes
11/6/2025

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
W912HY25BA023

Budget estimate

$10,000,000 – $50,000,000

The budget for this project is likely to be in the range of $10 million to $50 million, based on the scope of the work and the complexity of the project. The government will pay the contractor based on the quantity of material dredged, with payments made on a monthly basis. The total budget will depend on the final quantity of material dredged and the contractor's ability to complete the work efficiently.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Texas

Top match · 75%

FY26 HOUSTON SHIP CHANNEL, TEXAS BAYPORT FLARE HOPPER DREDGING

Closes 11/2/2026Opened 8/31/2026

U.S. Department Of Defense·Texas

73% match

FY27 Texas City Ship Channel Main Channel and Turning Basin

Closes 11/7/2026Opened 10/28/2026

U.S. Department Of Defense·Texas

73% match

FY26 HOUSTON SHIP CHANNEL, TEXAS BAYPORT FLARE HOPPER DREDGING

Closes 11/10/2026Opened 9/30/2026

U.S. Department Of Defense·Georgia

72% match

Sources Sought for FY26 Atlantic Intracoastal Waterway Maintenance Dredging ��������� Select Sites

Closes 11/20/2026Opened 10/19/2026

U.S. Department Of Defense·Texas

71% match

Gulf Intracoastal Waterway High Island to Causeway with Channel to Port Bolivar Maintenance Dredging

Closes 11/3/2026Opened 9/28/2026

U.S. Department Of Defense·Louisiana

71% match

Mermentau River Bar Channel Dredging, Mermentau River – Gulf of America, Maintenance Dredging, #26-1

Closes 10/1/2028Opened 9/1/2026

U.S. Department Of Defense·Texas

71% match

Houston Ship Channel (HSC) Expansion Channel Improvement Project (ECIP) 11, Package 9, Segment 4 Boggy Bayou to Sims Bayou

Closes 12/1/2026Opened 10/28/2026

U.S. Department Of Defense·Louisiana

70% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 8-2025 (OM25008)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

70% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 6-2025 (OM25006)

Closes 3/23/2027Opened 3/26/2025

U.S. Department Of Defense·Louisiana

70% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 5-2025 (OM25005)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

70% match

Barataria Bay Waterway, Maintenance Dredging, Bar Channel

Closes 9/16/2028Opened 9/11/2026

U.S. Department Of Defense·Louisiana

70% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)

Closes 2/3/2027Opened 3/28/2025

U.S. Department Of Defense·Louisiana

70% match

Barataria Bay Waterway, Maintenance Dredging, Bar Channel

Closes 9/16/2028Opened 8/10/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 4/27/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 7-2026 (OM26007)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

69% match

ATCHAFALAYA RIVER BAY, BAR, AND CREWBOAT CUT CUTTERHEAD DREDGE NOS. 2-2026, OM26060

Closes 4/7/2027Opened 3/23/2026

U.S. Department Of Defense·Louisiana

69% match

Tiger Pass Dredging Over Utility Corridor, Plaquemines Parish,

Closes 2/5/2027Opened 12/11/2024

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

69% match

ATCHAFALAYA RIVER BAY, BAR, AND CREWBOAT CUT CUTTERHEAD DREDGE NOS. 3-2026, OM26061

Closes 4/7/2027Opened 3/23/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·California

69% match

BRINE PIPELINE ACCESS IMPROVEMENTS

Closes 2/4/2027Opened 8/12/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 9-2025 (OM25009)

Closes 3/23/2027Opened 2/4/2025

Texas Parks & Wildlife Department·Texas

69% match

P# - New Public Water System, Colorado Bend State Park, Bend County, Texas

Closes 12/2/2026Opened 10/30/2026