Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Pathway Repairs

City of Mountain View·California

Pathway Repairs

Closes 3/24/2026$300k – $600kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Mountain View is seeking qualified contractors to repair, replace, overlay, and seal‑coat asphalt‑concrete and concrete pathways in seven municipal parks. Work includes full‑depth asphalt removal and replacement, concrete sidewalk removal and replacement, overlay of existing surfaces, and application of a protective seal‑coat. The contract is a lump‑sum, item‑by‑item bid covering roughly 75,000 sq ft of work, to be completed within a 90‑day calendar period after the purchase order is issued. Bidders must hold a valid California Class A, C12, or C32 contractor license, provide performance and payment bonds, carry required insurance, and submit a 10 % bid deposit. A mandatory pre‑bid conference is scheduled for March 4, 2026, and all questions must be submitted by March 12, 2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kim Truong(Senior Management Analyst)

[email protected]

(650) 903-6324

Key dates

Opened
2/26/2026
Questions due
3/12/2026
Pre-bid meeting
3/4/2026Mandatory
Closes
3/24/2026
Projected award
4/20/2026
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237120
Solicitation №
R261775

Budget estimate

$300,000 – $600,000

Based on the total scope (~75,000 sq ft) and typical municipal rates—approximately $5‑$8 per sq ft for asphalt overlay, $10‑$14 per sq ft for asphalt removal/replacement, $12‑$16 per sq ft for concrete removal/replacement, and $1‑$2 per sq ft for seal‑coat—the overall contract value is estimated between $300,000 and $600,000. The lower bound assumes minimal material costs and efficient crew utilization; the upper bound reflects higher labor rates, premium materials, and contingency allowances.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Illinois Tollway·Illinois

Top match · 68%

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

Miami-Dade County·Florida

68% match

International Gardens Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

City of Green Bay·Wisconsin

66% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Ormond Beach - Purchasing Office·Florida

65% match

Main Trail Bridge Repair

Closes 11/6/2026Opened 9/27/2026

Kenosha County·Wisconsin

65% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Miami-Dade County·Florida

65% match

International Gardens Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

Illinois Tollway·Illinois

65% match

RR-26-2069 - Systemwide Pavement Repairs

Closes 12/10/2026Opened 10/31/2026

Idaho Transportation Department·Idaho

65% match

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/17/2026Opened 10/10/2026

City of Ontario·California

64% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

Town of Bluffton·South Carolina

64% match

Pathway Pedestrian Improvements Phase 3

Closes 11/12/2026Opened 10/13/2026

Niagara Frontier Transit Authority (NFTA)·New York

64% match

10LZ2413 - LRRT Capital Repairs 2026

Closes 11/17/2026Opened 10/27/2026

City of Pueblo·Colorado

64% match

Concrete Improvements - Elmwood Golf Course Cart Paths Phase 2

Closes 11/17/2026Opened 10/27/2026

U.S. Department Of Transportation·Mississippi

64% match

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 11/10/2026Opened 10/8/2026

City of Charlotte·North Carolina

63% match

Bridge Repairs

Rolling / TBD closeOpened 1/1/2027

LA Public Works Engineering Bureau·California

63% match

BRIDGE REPAIR MAINTENANCE GROUP 2 (RE-BID)

Closes 12/9/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

63% match

66--INERTIAL NAVIGATION, IN REPAIR/MODIFICATION OF

Closes 12/3/2026Opened 9/4/2026

City of Charlotte·North Carolina

63% match

CTC Drainage Repairs

Rolling / TBD closeOpened 1/20/2026

Miami-Dade County·Florida

63% match

Olympic Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

U.S. Department Of Defense·Pennsylvania

63% match

E-2D ROTODOME Systems_Renewing Repair BOA

Closes 12/11/2026Opened 10/27/2026

Massachusetts Department of Transportation·Massachusetts

63% match

616401 DISTRICT 5 Scheduled and Emergency Structural Repairs at Various Locations

Closes 11/17/2026Opened 10/13/2026

City of Charlotte·North Carolina

63% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

Ontonagon County Road Commission·Michigan

63% match

Ontonagon County Road Commission Bergland Garage No. 3 Building Repairs

Closes 11/10/2026Opened 10/17/2026

Mississippi Department of Finance and Administration·Mississippi

63% match

MMNS Trail Repairs (GS# 610-015)

Closes 11/17/2026Opened 10/15/2026

City of Vernon·California

63% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

Port of Portland·Oregon

63% match

Portland International Airport Terminal Upper Roadway Joint Replacement

Closes 11/10/2026Opened 10/7/2026