Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Iowa guideIowa Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Iowa
  4. ›Construction
  5. ›Split Treatment Modifications at the Water Treatment Plant

City of Ames·Iowa

Split Treatment Modifications at the Water Treatment Plant

Closes 9/23/2026$500k – $1MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Ames is seeking a qualified contractor to perform split‑treatment modifications at its Water Treatment Plant. The work includes live‑tapping two 24‑inch raw water lines, installing new 6‑inch ductile‑iron pipe, valves, fittings, a magnetic flow meter, two centrifugal pumps with variable‑frequency drives, and all associated electrical, conduit, and control‑system integration. The contractor must supply labor, tools, equipment, and materials (except the flow meter provided by the City), obtain required certifications, and adhere to strict security and OSHA requirements. The project must be completed by March 26 2027, with a site visit strongly recommended before bid submission. • Scope: pipe, valves, pumps, VFDs, flow meter, electrical conduit, SCADA integration, concrete pads, safety bollards. • Live tap of two 24″ water lines, installation of ~35 ft of 6″ ductile‑iron pipe. • Two 6″ centrifugal pumps (Andritz ACP100‑200.5S) with VFDs, plus associated wiring and PLC integration. • Owner‑provided 6″ electromagnetic flow meter; contractor handles installation, calibration, and SCADA hookup. • All work limited to Mon‑Fri 7 am‑5 pm; optional Saturday work requires prior written approval. • Mandatory corporate surety bond (100 % of contract price) and performance/security requirements. • Bids due electronically 9/23/2026; questions due 9/15/2026; award announced 10/13/2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Amanda Moore(Procurement Specialist II)

[email protected]

(515) 239-5183

Key dates

Opened
8/26/2026
Questions due
9/15/2026
Closes
9/23/2026
Projected award
10/13/2026
Duration
5 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
2027-018 Addendum 2

Budget estimate

$500,000 – $1,000,000

Based on the scope—live‑tapping two large water lines, installing ~35 ft of ductile‑iron pipe, two centrifugal pumps with VFDs, associated valves, fittings, concrete pads, security bollards, and extensive electrical/SCADA work—the contract is likely in the mid‑six‑figure range. Material costs (pumps, VFDs, pipe, fittings) could run $250‑$400 k, while labor, mobilization, bonding, and overhead could add another $250‑$600 k. Therefore a reasonable estimate is $500,000 to $1,000,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Hollywood·Florida

Top match · 71%

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

City of Fond du Lac·Wisconsin

70% match

MIXED LIQUOR SPLITTER STRUCTURE IMPROVEMENTS

Closes 11/18/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

70% match

Waste Water Treatment Plant Services

Closes 11/23/2026Opened 10/12/2026

City of Riverside·California

70% match

SITE MODIFICATIONS AT THE PALMYRITA WATER TREATMENT PLANT FOR PFAS REMOVAL

Closes 11/24/2026Opened 10/15/2026

City of Long Prairie·Minnesota

69% match

Long Prairie, City of Water Treatment Plant Rehabilitation 25X.138024

Closes 11/18/2026Opened 10/29/2026

City of Hollywood·Florida

69% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

City of Hollywood·Florida

69% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

City of Kyle·Texas

69% match

Yarrington Water Treatment Plant Disinfection Modification

Closes 12/1/2026Opened 10/26/2026

Dickenson County·Virginia

68% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

Saline County Waterworks and Sanitary Sewer Public Facilities Board·Arkansas

68% match

Saline County Waterworks & Sanitary Sewer Public Facilities Board – WWTP Improvements

Closes 11/12/2026Opened 10/18/2026

City of Holly Grove·Arkansas

68% match

City of Holly Grove Water System Improvements – Water Tank Rehabilitation and Plant Building Modification

Closes 11/18/2026Opened 10/25/2026

City of Grand Pass·Oregon

68% match

Water Treatment Plant Solids Hauling FY24-26

Closes 12/31/2026Opened 3/1/2023

Oregon City of Ashland·Oregon

68% match

Ashland Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

City of Neptune Beach·Florida

68% match

Water Treatment Plant Ground Storage Reservoir Rehabilitation

Closes 11/9/2026Opened 10/2/2026

City of Charlotte·North Carolina

68% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

Contra Costa Water District·California

67% match

Bollman Water Treatment Plant Improvements

Closes 12/10/2026Opened 10/29/2026

City of Hollywood·Florida

67% match

Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)

Closes 11/18/2026Opened 9/9/2026

Pittsylvania County·Virginia

67% match

RFP# 20261014 Hurt Water Treatment Plant

Closes 11/12/2026Opened 10/14/2026

City of Austin·Texas

67% match

Ullrich WTP Inherently Safer Disinfection Conversion

Rolling / TBD closeOpened 4/27/2026

City of Stillwater·Oklahoma

67% match

Stillwater Regional Water Treatment Plant Solid Contact Units Rehabilitation

Closes 11/11/2026Opened 10/10/2026

The Metropolitan Water District of Southern California·California

67% match

Solids Removal and Disposal Services for MWD Skinner Water Treatment Plant

Closes 11/19/2026Opened 10/15/2026

City of Chicago·Illinois

67% match

Eugene Sawyer Water Purification Plant (ESWPP) Low Lift Pump Building, Chemical Building, and Garage Roof Replacement

Closes 12/18/2026Opened 10/12/2026

City of Ashland·Oregon

67% match

City of Ashland, Ashland Creek Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

Massachusetts Auburn Water District Inactive·Massachusetts

67% match

Qualifications for Water Treatment Plant Construction

Closes 1/4/2027Opened 10/28/2026

Dept of Natural Resources·Wisconsin

66% match

Private Drinking Water Treatment System Consulting, Equipment and Installation Services – Marinette

Closes 11/13/2026Opened 10/26/2026