Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wyoming guideWyoming Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wyoming
  4. ›Construction
  5. ›Van Buren Ave - Street Curb and Gutter Improvements

City of Cheyenne·Wyoming

Van Buren Ave - Street Curb and Gutter Improvements

Closes 10/27/2026$1M – $3MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Cheyenne is seeking qualified contractors to perform comprehensive street‑level improvements on Van Buren Avenue. The scope includes installing a new 12‑inch water main with valves, fittings and fire hydrants, upgrading storm‑drain infrastructure, removing existing asphalt and chain‑link fencing, excavating and back‑filling, providing traffic and erosion control, and restoring the right‑of‑way with new asphalt, concrete curb and gutter, landscaping, riprap, signage, and related utilities. The contract will be awarded to the lowest responsible bidder that meets residency and bonding requirements, with a performance and payment bond equal to 100 % of the awarded price and a 5 % bid guarantee. Work is expected to begin after the Notice to Proceed (estimated December 1 2026) and be completed by April 30 2027. • Install 12‑in. water main, valves, fire hydrants, and storm‑drain inlets. • Remove existing asphalt, chain‑link fence, and perform excavation/back‑fill. • Provide traffic control, erosion control, and site safety measures. • Re‑pave with asphalt, install new concrete curb & gutter, landscaping, riprap, and signage. • Required 5 % bid guarantee; 100 % performance/pay‑ment bonds; Wyoming labor/materials preference. • Pre‑bid Zoom meeting (optional) on Oct 2 2026; bid submission deadline Oct 27 2026, 2 pm.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

TJ Barttelbort(Purchasing Manager)

[email protected]

(307) 773-1045

Key dates

Opened
9/23/2026
Questions due
10/9/2026
Pre-bid meeting
10/2/2026
Closes
10/27/2026
Projected award
11/23/2026
Duration
5 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
S-3-27

Budget estimate

$1,000,000 – $3,000,000

The solicitation does not disclose a total contract value. Based on typical municipal street‑rehabilitation projects of this size—approximately 1 mile of water main, 1,000 linear feet of curb & gutter, and associated pavement, drainage, and landscaping—the total construction cost in Wyoming is likely in the low‑to‑mid‑million‑dollar range. Assuming average unit costs (water main $150‑$250/ft, curb & gutter $30‑$45/ft, asphalt $5‑$7/ft², and ancillary work), a reasonable estimate is between $1,000,000 and $3,000,000. The final budget will depend on the winning bid, change orders, and any applicable resident‑labor/materials preferences.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

NYS East Fishkill, Town of·New York

Top match · 71%

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

Georgia City of College Park·Georgia

71% match

MAIN STREET STREETSCAPE IMPROVEMENTS

Closes 11/10/2026Opened 10/28/2026

City of Richmond Government·Virginia

71% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

Nevada Government·Nevada

71% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

City of Vernon·California

71% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

Municipality of Anchorage·Alaska

70% match

4th Avenue Reconstruction – G Street to E Street (Project 21‑22)

Closes 11/4/2026Opened 10/7/2026

City of Danville·Virginia

70% match

IFB-26-27-024-Curb Market Parking Lot Improvements

Closes 11/3/2026Opened 10/8/2026

Village of Glenview·Illinois

70% match

Crabtree Ln, Linneman St, Virginia Ln Roadway & Utility Improvements

Closes 11/12/2026Opened 10/29/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

70% match

SALES TAX STREET AND ROAD REHABILITATION PROGRAM PROJECT 21-7 STREETS IN TARA, OXFORD PLACE, SHERWOOD FOREST BLVD, DARRYL DR, BARD, & OAK KNOLL CITY PARISH PROJECT NO. 25-AO-ST-0026

Closes 11/3/2026Opened 10/9/2026

City of Riverside·California

70% match

Stover Avenue Sidewalk Improvements (Fury Drive to Eagle Rock Drive)

Closes 11/9/2026Opened 10/8/2026

City of Stillwater·Oklahoma

69% match

Roadway and Utility Improvements for Knoblock Street, 4th Avenue and Lincoln Street Project Number: 25TR04

Closes 11/17/2026Opened 10/17/2026

City of Torrance·California

69% match

Residential and Arterial Pavement Improvement, I-159/I-139

Closes 11/18/2026Opened 10/18/2026

City of Indianapolis·Indiana

69% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/9/2026

Central Midlands Council of Governments·South Carolina

69% match

Sidewalk Additions along Drayton Street, Park Street, Vanderhorst Street, and Chalmers Street

Closes 11/5/2026Opened 10/2/2026

Maryland Baltimore City Department of Transportation·Maryland

69% match

TR-27006 CURB REPAIR CITYWIDE

Closes 11/18/2026Opened 10/24/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

69% match

CORA DRIVE SIDEWALK IMPROVEMENTS PROJECT CITY-PARISH PROJECT No. 24-EN-HC-0025

Closes 11/17/2026Opened 10/16/2026

Massachusetts City of Brockton·Massachusetts

69% match

BID FOR: Intersection Improvements at Two Locations: Pleasant St at Spring St and Main St at Nilsson

Closes 11/19/2026Opened 10/22/2026

City of Frazee, MN·Minnesota

69% match

2026 Sanitary Lift Station Improvements - Main Ave E & 2nd Street SW

Closes 11/18/2026Opened 10/16/2026

Charleston County·South Carolina

69% match

Road Work - Riverland Drive (S-53) Pedestrian Improvements & Central Park Road (S-67) Roadway Improvements

Closes 12/1/2026Opened 10/30/2026

City of Pueblo·Colorado

69% match

West Side Improvements - Bus Stops Package 1

Closes 11/4/2026Opened 9/22/2026

City of Ontario·California

69% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

City of Pasadena·California

69% match

Annual ADA Citywide/Miscellaneous Sidewalk Improvement Program and Street Drainage Project FY 2027

Closes 11/20/2026Opened 10/29/2026

New York City Department of Design and Construction·New York

69% match

HWCB27KR: REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

City of Coronado·California

69% match

Downtown Enhancements – Phase 1

Closes 11/12/2026Opened 10/8/2026

City of Fort Wayne·Indiana

69% match

0482S - St. Joe Center Road Sidewalk Extension

Closes 11/12/2026Opened 10/29/2026