The FY25 Buffalo Harbor Dredge project involves dredging from Sta. 150+00 downstream to the mouth of the river and the ship canal. The project includes mobilization and demobilization, dredging, and the installation of a turbidity curtain. The estimated total amount for the project is $1,114,359.47.
• The project requires dredging of approximately 55,000 cubic yards of material.
• The estimated unit price for dredging is $11.75 per cubic yard.
• The project also includes the installation of a turbidity curtain, estimated to cost $53,992.07.
• The project has an option for additional dredging, estimated to cost $276,250.00.