The City of Sunrise is seeking bids for the Basin 15 Drainage Improvements - Phase 1 - NW 108th Avenue Culvert Replacement project. The project involves sediment and turbidity control, pollution prevention, clearing and grubbing, maintenance of traffic, canal bypass pumping, dewatering, demolition and replacement of existing canal culvert pipe and street drainage pipe and structures, demolition and restoration of pavement, curb and sidewalk, shaping and excavation and grading of the existing canals banks, construction of concrete end walls, construction of filter point grout mat, replacement of existing 10” PVC gravity sewer main with 10” ductile iron pipe, pavement milling and resurfacing, pavement markings, sodding, guardrail and other miscellaneous and incidental items for a complete project.
• The project requires experience in drainage engineering, irrigation, drainage, flood control engineering, public utilities, water, sewer and gas maintenance and repair services, storm drainage, and contracted services, utilities.
• The project involves multiple stakeholders, including the City of Sunrise, contractors, and the public.
• The project requires compliance with relevant laws, regulations, and industry standards.
• The project involves a non-mandatory pre-bid meeting on June 9, 2026, at 9:00 AM.
• The project requires bidders to submit their bids by June 25, 2026, at 6:00 PM.