Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Missouri
  4. ›Construction
  5. ›California High School PAC Set Design Addition

California R-1 School District·Missouri

California High School PAC Set Design Addition

Closes 9/29/2026$250k – $400kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The California R‑1 School District is soliciting bids for the design‑build of a 1,320 sq ft workshop addition to the existing Performing Arts Center at California High School, including an open workspace, a single‑occupancy restroom, site work, a concrete drive, and an ADA‑compliant ramp. The scope covers all construction activities, coordination with existing facilities, and compliance with Missouri Prevailing Wage Law and E‑Verify. Bidders must attend a mandatory pre‑bid conference and submit bids by the stated deadline; performance and payment bonds are required. • Addition of 1,320 sq ft workshop with restroom and ADA ramp. • Site work including concrete drive and ramp construction. • Mandatory pre‑bid conference (September 15, 2026) and bond requirements (5 % bid bond, 100 % performance/payment bonds). • All work must adhere to Missouri prevailing‑wage and E‑Verify regulations.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jason Smith

[email protected]

Key dates

Opened
9/3/2026
Pre-bid meeting
9/15/2026Mandatory
Closes
9/29/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
26-223

Budget estimate

$250,000 – $400,000

Based on typical institutional construction costs of roughly $200 – $300 per square foot for a modest workshop addition plus site work, the 1,320 sq ft project likely falls between $250,000 and $400,000 in total contract value. This range accounts for regional labor rates in Missouri, required bonding, and the additional driveway and ADA ramp.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Michigan Warren Consolidated Schools·Michigan

Top match · 63%

RFP - WCS 2022 Bond - BP 18 SHHS PAC - Addendum 1

Closes 11/5/2026Opened 10/29/2026

Tangipahoa Parish School System·Louisiana

62% match

Ponchatoula High School 18 Classroom Addition and Cafeteria

Closes 12/3/2026Opened 10/16/2026

Jefferson County Public Schools·Kentucky

62% match

ADDENDUM #1: JCPS-8595 Large Lunchroom Equipment (Line Item)

Closes 11/10/2026Opened 10/23/2026

State Center Community College District·California

62% match

Progressive Design-Build Services, West Fresno Interdisciplinary Classroom & Cafe, FCC

Closes 11/17/2026Opened 7/15/2026

LAUSD·California

61% match

DESIGN BUILD | RFQ # R-27016 - 107TH STREET ELEMENTARY | SEISMIC MODERNIZATION PROJECT

Closes 12/21/2026Opened 10/16/2026

Tangipahoa Parish School System·Louisiana

61% match

Champ Cooper Elementary School 10 Classroom Addition

Closes 11/5/2026Opened 10/2/2026

San Gabriel Unified School District·California

60% match

Project: PROJECT 25-89001

Rolling / TBD closeOpened 10/5/2026

Michigan Godwin Heights Public Schools·Michigan

60% match

High School Addition & Renovations

Closes 11/24/2026Opened 10/29/2026

San Gabriel Unified School District·California

60% match

2022-0617 - WILSON ELEMENTARY SCHOOL INTERIM HOUSING - BIDDING SET

Rolling / TBD closeOpened 8/4/2026

California Department of Forestry and Fire Protection·California

60% match

9TSC0108-Fresno Air Attack Base Infrastructure Improvements

Closes 12/1/2026Opened 9/25/2026

Lexington / Richland County School District Five·South Carolina

60% match

School Signage

Closes 9/10/2027Opened 8/24/2026

Texas Fort Bend ISD·Texas

60% match

Athletics Audio & Visual Equipment, Related Items and Services

Closes 11/16/2026Opened 10/11/2026

Catalina Foothills Unified School District·Arizona

59% match

RFP 27-04-32 Community Schools Supplemental Enrichment Courses

Closes 12/3/2026Opened 10/20/2026

Riverside Unified School District·California

59% match

Electronic Marquee Upgrades at North HS and Miller MS

Closes 12/3/2026Opened 10/26/2026

Miami-Dade County Public Schools·Florida

59% match

Interactive Panels, Digital Signage, Mobile Stands and Installation Services

Closes 11/5/2026Opened 9/3/2026

Riverside Unified School District·California

59% match

CUPCCAA Chemawa and Rivera Public Address System Replacement

Closes 11/10/2026Opened 10/10/2026

Hacienda La Puente Unified School District·California

59% match

Bid 2026-27.04 NOTICE INVITING BIDS_Glen A Wilson High School Replacement of Stadium Electrical Equipment & Wiring

Closes 11/10/2026Opened 10/8/2026

Berkeley County School District·South Carolina

59% match

Berkeley Middle School Roof Replacement

Closes 11/17/2026Opened 10/19/2026

Snowline Joint Unified School District·California

59% match

BID 2627-004 Serrano Track & Field Renovation Project Notice Inviting Bids

Closes 11/3/2026Opened 10/13/2026

San Gabriel Unified School District·California

59% match

2026-Bid-SG-05_Addendum Three_Drawing - Roosevelt ES Playground Replacement

Rolling / TBD closeOpened 8/4/2026

Tangipahoa Parish School System·Louisiana

59% match

Loranger High School 20 Classroom Addition

Closes 11/18/2026Opened 10/19/2026

Lancaster County School District·South Carolina

59% match

Cafeteria Equipment for Multiple School Locations

Closes 11/10/2026Opened 10/21/2026

LAUSD·California

59% match

BEST VALUE | RFQ/BID #2710065 | SOUTH GATE HIGH SCHOOL | MULTIPURPOSE FIELD UPGRADES WITH SYNTHETIC TURF (PSA)

Closes 11/2/2026Opened 10/14/2026

California Grants·California

59% match

Charter School Facilities Program (CSFP)

Rolling / TBD closeOpened 6/24/2025

California Department of Education·California

59% match

Supporting Priority School Districts Program - CN270001 RFP

Closes 1/4/2027Opened 10/22/2026