This addendum clarifies the requirements for the Roosevelt Elementary School Playground Replacement project. The contractor will be responsible for full demolition of existing playground elements, installation of new concrete paving, a poured‑in‑place rubber‑urethane surfacing system, stabilized decomposed granite pathways, turf, new irrigation infrastructure, and comprehensive tree‑protection and landscaping. The scope also includes extensive submittal documentation, change‑order management, and compliance with safety, environmental, and accessibility standards.
• Demolition of existing playground, surfacing, and related hardscape while protecting trees and utilities.
• New concrete basemat, curbs, gutters, and a two‑layer rubber‑urethane playground surfacing (Super‑7 or Extreme‑10) with warranty.
• Installation of stabilized decomposed granite, AG sod, and a new irrigation system, plus tree‑protection plan and landscaping per design.
• Detailed submittals, schedule of values, allowances (e.g., $45 k playground allowance), and strict change‑order procedures.
• Compliance with California State Architect specifications, safety (NFPA 241), storm‑water control, and accessibility requirements.