Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›2026-Bid-SG-04_Addendum Three Narrative_Gabrielino HS HVAC…

San Gabriel Unified School District·California

2026-Bid-SG-04_Addendum Three Narrative_Gabrielino HS HVAC Replacement

Rolling / TBD close$2M – $4MInvitation for Bid
Get bids like this by emailBid source

Description

This addendum clarifies technical requirements for the HVAC replacement project at Gabrielino High School, involving mechanical, electrical, and fire‑alarm work. The district will provide 16 Carrier HVAC units; the contractor must size and install disconnects and over‑current protection per the Carrier MEOR submittal, install one new roof curb, and integrate fire‑alarm devices with the existing Simplex system, handling disconnect, safe‑off, reconnection, programming, and testing. • Use Carrier‑approved submittal for equipment sizing, disconnect and fuse sizing. • Install only one new roof curb; all other curbs are existing. • All fire‑alarm equipment must be Simplex, coordinated per sheet E0.4 and Specification 28‑46‑20. • Electrical contractor responsible for branch‑circuit upgrades and fire‑alarm integration.

Attached files

Contact

Alfred Delguilldo

(562) 201-4809

Key dates

Opened
6/11/2026
Closes
Rolling / TBD

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238220
Solicitation №
2026-Bid-SG-04

Budget estimate

$2,000,000 – $4,000,000

Based on typical costs for high‑school HVAC retrofits (approximately $120‑$180 k per unit) plus electrical and fire‑alarm integration (roughly $500‑$800 k), the total project value likely falls between $2 million and $4 million. Larger units and the need for precise electrical work push the upper range higher.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

San Gabriel Unified School District·California

Top match · 93%

2026-Bid-SG-04_Addendum One Narrative_Gabrielino HS HVAC Replacement

Rolling / TBD closeOpened 8/4/2026

San Gabriel Unified School District·California

92% match

2026-Bid-SG-04 Attachment BB Gabrielino HVAC Architectrual Bid Narrative_Addendum 2

Rolling / TBD closeOpened 5/20/2026

San Gabriel Unified School District·California

91% match

2026-Bid-SG-04_Addendum Two Narrative_Gabrielino HS HVAC Replacement

Rolling / TBD closeOpened 6/10/2026

San Gabriel Unified School District·California

87% match

2026-Bid-SG-04_Addendum One_Mobilization Exhibit_Gabrielino HS HVAC Replacement

Rolling / TBD closeOpened 5/6/2026

San Gabriel Unified School District·California

85% match

Project: 2026-BID-SG-04 ATTACHMENT AA

Rolling / TBD closeOpened 5/1/2026

San Gabriel Unified School District·California

85% match

2026-Bid-SG-04 Plans Gabrielino HS HVAC Replacement

Rolling / TBD closeOpened 10/3/2026

San Gabriel Unified School District·California

85% match

2026-Bid-SG-04 Technical Specs Gabrielino HS HVAC Replacement

Rolling / TBD closeOpened 8/4/2026

San Gabriel Unified School District·California

84% match

2026-Bid-SG-03_Addendum One_Narrative_Gabrielino HS Small Gym Demo

Rolling / TBD closeOpened 5/28/2026

Atlantic County Special Services School District·New Jersey

83% match

Bid 27-01 ACSSSD 18-21 Suite Addendum 1 (26.055 2026-09-10 )

Rolling / TBD closeOpened 9/10/2026

San Gabriel Unified School District·California

83% match

2026-Bid-SG-04 DIV01 Gabrielino HS HVAC Replacement

Rolling / TBD closeOpened 8/4/2026

San Gabriel Unified School District·California

81% match

2026-Bid-SG-03_AddendumTwo_Narrative_GabrielinoHSSmallGymDemo

Rolling / TBD closeOpened 6/5/2026

San Gabriel Unified School District·California

81% match

Addendum One_Narrative - McKinley Irrigation Replacement

Rolling / TBD closeOpened 8/4/2026

School District of Philadelphia (Capital Opportunities)·Pennsylvania

80% match

FIRE ALARM SYSTEM REPLACEMENTATMASTERMAN SCHOOL1645 SPRING GARDEN STREETPHILADELPHIA, PA 19130

Closes 11/5/2026Opened 10/1/2026

San Gabriel Unified School District·California

79% match

2026-Bid-SG-06_AddendumOne_Narrative-McKinley Irrigation Replacement

Rolling / TBD closeOpened 7/21/2026

Rialto Unified School District·California

79% match

Carter HVAC Replacement

Closes 12/1/2026Opened 10/28/2026

Vernon Township School District·New Jersey

79% match

Legal Notice - Advertisement for Bid (Fire Alarm Upgrades)

Rolling / TBD closeOpened 3/12/2026

San Gabriel Unified School District·California

79% match

2026-Bid-SG-05_Addendum Three_Drawing - Roosevelt ES Playground Replacement

Rolling / TBD closeOpened 8/4/2026

University of Missouri-Columbia·Missouri

79% match

Telecom Building - Fire Alarm System Upgrades (CP252751)

Closes 11/5/2026Opened 9/9/2026

School District of Philadelphia (Capital Opportunities)·Pennsylvania

78% match

FIRE ALARM SYSTEM REPLACEMENTATMASTERMAN SCHOOL1645 SPRING GARDEN STREETPHILADELPHIA, PA 19130

Closes 10/29/2029Opened 10/1/2026

San Gabriel Unified School District·California

78% match

2026-Bid-SG-03_Addendum One_ Contractor business cards_Gabrielino HS Small Gym demo

Rolling / TBD closeOpened 8/4/2026

U.S. Department Of Defense·California

78% match

Replace HVAC Rooftop Units at Building 2275

Closes 11/4/2026Opened 10/21/2026

San Gabriel Unified School District·California

78% match

2026-Bid-SG-05_Addendum One_Narrative - Roosevelt ES Playground Replacement

Rolling / TBD closeOpened 8/4/2026

Stockton Unified School District·California

78% match

RFQ/P #26-27-12 Franklin High School Building "A" HVAC Project

Closes 11/19/2026Opened 10/28/2026

Massachusetts Easthampton Housing Authority·Massachusetts

77% match

Easthampton Fire Alarm (FA) Upgrade 667-1, 2 & 3

Closes 11/20/2026Opened 10/28/2026

California Military Department·California

77% match

IFB 133896 Fire Alarm System Replacement

Closes 12/1/2026Opened 10/27/2026