Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›MOAPA VALLEY NWR INTERPRETIVE PANELS 2026

US Government Publishing Office·United States of America

MOAPA VALLEY NWR INTERPRETIVE PANELS 2026

Closes 1/27/2026$10k – $50kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The US Government Publishing Office is seeking a contractor to fabricate seven exterior interpretive exhibit panels for the Moapa Valley National Wildlife Refuge. The panels must be printed using UV-cured inks and be fade and weather resistant, with a minimum lifespan of 10 years. The contractor must have experience fabricating exterior exhibit panels from Adobe software files and must use exterior-grade CHPL material. The panels will be used for outdoor display and must be able to withstand harsh conditions. Key requirements include: • Printing signs with type/rule matter, agency logos, illustrations, halftones, and solids in four-color process • Using UV-cured inks suitable for sunlight and severe outdoor exposure • Fabricating panels in exterior-grade CHPL material • Providing threaded mounting holes in the back of each panel • Submitting virtual PDF proofs and pre-production samples for approval • Delivering the final products to the specified location via traceable means

Attached files

Contact

Timothy Sankey(Contract Administrator)

[email protected]

(202) 512-0488

Key dates

Opened
1/23/2026
Closes
1/27/2026
Duration
42 days

Last updated

Details

Type
Request for Quotation
Industry
Manufacturing
NAICS
238990
Solicitation №
JACKET:470-298

Budget estimate

$10,000 – $50,000

The budget for this opportunity can be estimated based on the cost of materials, labor, and equipment required to fabricate the seven exterior interpretive exhibit panels. The cost of materials, such as exterior-grade CHPL material and UV-cured inks, can range from $500 to $2,000 per panel, depending on the size and complexity of the design. Labor costs can range from $1,000 to $5,000 per panel, depending on the level of expertise and the time required to complete the project. Equipment costs, such as printing and cutting equipment, can range from $5,000 to $20,000, depending on the type and quality of the equipment. Based on these estimates, the total budget for this opportunity can range from $10,000 to $50,000, depending on the contractor's level of expertise, the complexity of the design, and the equipment required to complete the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. DOT Federal Highway Administration·United States of America

Top match · 64%

Fiscal Year 2026 Wildlife Crossings Pilot Program

Closes 11/16/2026Opened 9/30/2026

U.S. Environmental Protection Agency·United States of America

64% match

Fiscal Year (FY) 2026 Funding Opportunity for Indian Tribes and Intertribal Consortia for Nonpoint Source Management Grants Under Clean Water Act Section 319

Closes 11/9/2026Opened 8/17/2026

Manatee County - Purchasing Division·Florida

63% match

MUSGRAVE RANCH ROAD FLOODPLAIN COMPENSATION

Closes 11/20/2026Opened 10/15/2026

Lower Platte North Natural Resources District·Nebraska

63% match

LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT WAHOO CREEK WATERSHED SITES 55 AND 84

Closes 12/2/2026Opened 9/17/2026

County of Marin·California

63% match

MCP 2026-07 CASCADE CANYON TRAIL BRIDGE PROJECT

Closes 12/3/2026Opened 10/27/2026

U.S. Geological Survey·United States of America

63% match

WATER RESOURCES RESEARCH ACT PROGRAM NATIONAL COMPETITIVE GRANTS FY2026 (104g General)

Closes 11/12/2026Opened 9/30/2026

California Grants·California

63% match

Coachella Valley Proposition 68 Parks, Conservation Land Access and Climate Change Response Grant Program

Rolling / TBD closeOpened 1/21/2025

U.S. DOC NOAA - ERA Production·United States of America

62% match

DARRP Restoration Implementation Grants (2026)

Closes 11/18/2026Opened 9/1/2026

California Grants·California

62% match

Coachella Valley Open Space Acquisition Program

Rolling / TBD closeOpened 7/8/2024

Napa Valley Transportation Authority·California

62% match

South Napa County Station Area Plan

Closes 11/6/2026Opened 10/6/2026

California Grants·California

62% match

Desert Conservation Program

Rolling / TBD closeOpened 6/6/2025

Sarasota County·Florida

62% match

Physical Map Revision for Little Sarasota Bay, Lemon Bay, and Phillippi Creek Watersheds

Closes 11/19/2026Opened 10/21/2026

California Grants·California

62% match

Inland Wetlands Conservation

Rolling / TBD closeOpened 6/18/2025

California Grants·California

62% match

Lower American River Conservancy Program

Rolling / TBD closeOpened 6/6/2025

Washakie County Conservation District·Wyoming

61% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

U.S. Department Of The Interior·Alaska

61% match

C--Martime NWR Interpretive Exhibit Services

Closes 11/9/2026Opened 10/7/2026

California Department of Water Resources·California

61% match

Real-Time River Forecasting System

Closes 11/23/2026Opened 10/19/2026

California Grants·California

61% match

San Joaquin River Conservancy

Rolling / TBD closeOpened 6/6/2025

Lower Platte North Natural Resources District·Nebraska

61% match

LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT WAHOO CREEK WATERSHED SITE 77

Closes 12/2/2026Opened 9/18/2026

City of Merced·California

61% match

RFP for Murals at M St Bridge and Corp Yard

Closes 11/30/2026Opened 8/12/2026

Mohave County·Arizona

61% match

2027 Pre-Qualified Technical Registrants

Closes 11/4/2026Opened 10/1/2026

U.S. Forest Service·United States of America

61% match

Landscape Scale Restoration Grant Program for Tribes

Closes 1/26/2027Opened 10/28/2026

California Grants·California

61% match

Proposition 68 Rivers and Streams Grant Program

Rolling / TBD closeOpened 6/18/2025

U.S. Bureau of Reclamation·United States of America

61% match

Native American Affairs: Fiscal Year 2025 Colorado River Basin Tribal Drought Resiliency Program

Closes 11/20/2026Opened 6/2/2026

Warren County·New Jersey

61% match

Surveying Services

Closes 11/13/2026Opened 10/15/2026