The City of Gray is seeking engineering services for public infrastructure improvements, including water treatment plant upgrades, transmission main replacements, and distribution system rehabilitation. The selected firm will provide initial consultation, evaluation, funding assistance, preliminary engineering reports, final design, construction administration, and inspection and close-out services. The project is expected to last approximately 24 months, with an estimated timeline of 8 months for engineering design, 3 months for permit approval, 1 month for contract bidding, 2 months for contract award, and 12 months for construction. The firm will be evaluated based on their stability, relevant project experience, past performance, and suitability for the project.
Key points to consider:
• The project involves public infrastructure improvements, including water treatment plant upgrades and distribution system rehabilitation.
• The selected firm will provide a range of services, including initial consultation, evaluation, funding assistance, and construction administration.
• The project is expected to last approximately 24 months, with an estimated timeline of 8 months for engineering design, 3 months for permit approval, 1 month for contract bidding, 2 months for contract award, and 12 months for construction.
• The firm will be evaluated based on their stability, relevant project experience, past performance, and suitability for the project.
• The City of Gray reserves the right to reject any or all statements of qualifications or proposals, and to waive technicalities and informalities at their discretion.