The US Air Force is seeking a contractor to design, construct, and install a new 120ft tower at the Poinsett Range, Shaw AFB, to replace an existing structure and increase coverage to the range by reducing dead spots. The project includes a new tower, antennas, antenna cables, ice bridge, and ground ring tied into the shelter ground. The contractor shall provide all necessary personnel, equipment, installation, configuration management, labor, material, documentation, and services to support the program.
• The tower shall be a self-supporting, 120ft tower with ice bridge, designed to meet TIA-222g criteria.
• The contractor shall provide and install all necessary equipment, including antennas, antenna cables, and grounding systems.
• The contractor shall conduct a geotechnical evaluation for all foundation designs and ensure that the tower foundation design meets the TIA-222/G wind load standard.
• The contractor shall provide a detailed working schedule, program management, system engineering services, and quality assurance testing.
• The contractor shall optimize all RF equipment after system installation and ensure optimal performance and reliability.