The City of Long Beach is seeking bids for the Davies Boat Launch and Facility Improvements project. The project involves repaving and restriping the existing parking lot, removal and replacement of the boat launch ramp, restroom building, entrance gate, boat wash station, parking kiosk, traffic spike strip, token machine, sand-oil separator, and trash enclosures. The project also includes the installation of Portland cement concrete (PCC) sidewalk, curb, and gutter, as well as associated utility connections. The contractor will be responsible for providing all labor, materials, and equipment necessary to complete the project.
• The project requires a pre-bid meeting, which will be held on November 19, 2025, at 3:00 PM.
• The project has a mandatory pre-bid meeting.
• The project requires a site visit, which will be held on November 19, 2025, at 4:15 PM.
• The contractor will be responsible for providing a bid bond and a performance bond.
• The project has a fixed completion date of February 1, 2027.
• The contractor will be responsible for providing all necessary permits and approvals.
• The project requires compliance with all applicable laws and regulations, including those related to labor, safety, and environmental protection.