Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›Work Zone Traffic Control for I-287 for New York State…

New York State Thruway Authority (NYSTA)·New York

Work Zone Traffic Control for I-287 for New York State Thruway Authority (NYSTA)

Closes 12/1/2025$200k – $500kRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

KC Engineering and Land Surveying, P.C. (KC) is seeking a Subcontractor to provide Work Zone Traffic Control (WZTC) for survey crews in Rockland County for a portion of I-287 under Contract Number D214812. The work will consist of providing all labor, materials, machinery, tools, and equipment necessary to perform WZTC on I-287, Rockland County in the State of New York. The WZTC is required for KC, WSP USA Inc. (WSP), Hayduk Engineering LLC (Hayduk) and New York State Thruway Authority (NYSTA) personnel, or their authorized designee, to safely survey and perform other field investigations of approximately eight (8) miles of highway corridor in the Towns of Orangetown, Clarkstown, and Ramapo. Work shall be performed as described and in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) – 2009 and the New York State Supplement with all applicable revisions and the NYSTA Standard Sheets (Work Zone Traffic Control), dated May 1, 2025 Volumes 1 & 2. Applicable sheets are provided herewith in the IFB documents under Section TA-619. WZTC may be required for the following tasks: Shoulder closures: Per day for one crew Per day for two crews at different locations (two WZTC setups simultaneously) Right lane closures: Per day for one crew Per day for two crews at different locations (two WZTC setups simultaneously) Left lane closures: Per day for one crew Per day for two crews at different locations (two WZTC setups simultaneously) Bids for the above should be provided for daytime and nighttime mobilizations Daily rates for each of the above tasks must be provided. The project is subject to Prevailing Wage provisions. Mobilization by the WZTC Subcontractor is required within 48 hours (“working days”) of notification by KC. Cancellation of any WZTC deployment must be made by KC no later than four (4) hours prior to the scheduled WZTC mobilization. If cancellation by KC is made later than four (4) hours before the scheduled mobilization on any given day, the WZTC Subcontractor shall be entitled to full payment for the given task for that day. All rates shall be given for full day’s mobilization. A full day consists of 10 hours to allow for mobilization and demobilization of the set-ups. Payment for full days with multiple bid item set-ups will be based on a prorated basis. Payment for partial days of work will be 50% of bid price for up to 4 hours of field work and 100% thereafter. The Subcontractor’s crew’s travel time to and from the site shall not be included for full and partial days. The Subcontractor shall visit the site as a condition of submitting a bid. On-site safety of the WZTC Subcontractor’s personnel and the work area shall be the responsibility of the WZTC Subcontractor. Required Experience: The Subcontractor shall have a minimum of five (5) years documented experience in the performance of traffic control for NYSDOT and/or NYSTA projects. The successful bidder must provide at least three (3) NYSTA and/or NYSDOT references within the past five (5) years for verification with their proposal. All Subcontractors’ personnel assigned to this work shall have their flagging certification current, must be able to communicate in a clear and effective manner, and be familiar with the MUTCD – 2009 and New York State Thruway Authority Standard Sheets (Work Zone Traffic Control), dated May 1, 2025, Volumes 1 & 2 with all applicable revisions. The Subcontractor shall have a NYSDOT Vendor Responsibility Questionnaire on file with the State. Contract: The duration of the contract will be on an as-needed basis from approximately January 4, 2026, until December 31, 2026. The schedule is approximate and will be coordinated between KC and the Subcontractor. Schedule is subject to holiday embargos as specified by NYSTA. Included with their proposal, the WZTC Subcontractor shall provide a summary of ownership of all equipment necessary to provide the services required. A Foreman must be on-site at all times with a working cell phone, and the minimum crew shall be two (2) persons, which can include the foreman. KC is a Subcontractor for prime consultant WSP USA Inc. (WSP) under the NYSTA’s Contract No. D214812. All applicable provisions of KC’s subcontract apply to the Subcontractor. The following representatives will have the right to manage the site requirements: KC, WSP, Hayduk, and NYSTA personnel. KC reserves the right to reject any, and all bids, to waive any, and all informalities, to invite for new bid proposals, and to disregard all nonconforming, non-responsive or conditional bids. Bids shall be disqualified or rejected if: Bid is not received by the stated time and date. In the judgment of the consultant and/or NYSTA if the bidding entity is deemed to not have adequate equipment, experience, references or manpower to perform the required work. Insurance: The insurance requirements shall be in accordance with the specifications in the Bid Documents and shall consist of the following: Policies of Bodily Injury Liability and Property Damage Liability Insurance; Policies of Automobile and Truck Insurance; and Workmen’s Compensation Insurance. Permits – The design team (WSP & KCE) is responsible for coordination with NYSTA on lane closures and necessary permits. Deadline: Proposals prepared in conformance with the Bid Documents shall be accepted until 1:00 PM (Local Time), December 1, 2025. Bid Letting: Proposals should be sealed and submitted by mail. Electronic proposals, i.e., by e-mail will not be accepted. Signed proposals must be received by 1:00 PM (local time) on December 1, 2025. Proposals received after the deadline will not be accepted. No bid information or interpretations can be provided orally; all must be by written addenda sent out three (3) days before the submission of bids. The Award of the Contract will be made to the lowest qualified bidder within twenty (20) calendar days after receipt of Bids, subject to final approval of NYSTA. The successful bidder will be required to enter into a formal subcontract with KC. If the lowest qualified bidder is not able to provide their services in a timely manner, KC reserves the right to use the next lowest bidder. IFB Package can be found at this link: : D214812 Design Services for H445.1 Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 0.00% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 0.00% WBE Goal: 0.00% Disadvantaged Business Enterprise contracting goals (DBE) DBE Goal: 0.00%

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

David Baker(Survey Manager/Vice President)

[email protected]

(845) 931-2905

Key dates

Opened
11/7/2025
Closes
12/1/2025
Duration
12 months

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237310
Solicitation №
D214812 Design Services for H445.1

Budget estimate

$200,000 – $500,000

The budget for this opportunity is difficult to estimate without knowing the exact scope of work, the number of days required for WZTC, and the daily rates for each task. However, considering the project duration is approximately 12 months, and the work involves providing WZTC for survey crews, a rough estimate could be between $200,000 and $500,000. This estimate is based on the assumption that the daily rates for WZTC will be in the range of $1,000 to $5,000, depending on the type of closure and the number of crews required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Transportation, NYS Dept. of·New York

Top match · 73%

RFI2026-03 Roadway Work Zone Safety Training

Closes 11/9/2026Opened 9/21/2026

Texas Department of Transportation·Texas

70% match

Traffic Control Services, Statewide

Closes 11/20/2026Opened 10/21/2026

Transportation, NYS Dept. of·New York

70% match

Highway Work Permit System Services for NYSDOT

Rolling / TBD closeOpened 8/27/2026

Massachusetts Department of Transportation·Massachusetts

69% match

616472 DISTRICT 2 Deployment of Temporary Traffic Control Devices at Various Locations

Closes 11/17/2026Opened 10/26/2026

New York State Thruway Authority - Procurement Services·New York

68% match

Elevator Maintenance on the Governor Mario M. Cuomo Bridge for NY Division

Closes 11/30/2026Opened 9/25/2026

Massachusetts Department of Transportation·Massachusetts

68% match

616482 DISTRICT 4 Deployment of Temporary Traffic Control at Various Locations

Closes 11/17/2026Opened 10/26/2026

New York City Department of Transportation·New York

68% match

84126P0001-Develop, Deploy, Support and Maintain Existing and Future Citywide Transit Signal Priority (TSP)

Closes 11/10/2026Opened 10/8/2026

City University of New York (CUNY)·New York

68% match

Turnstile System Installation

Closes 11/30/2026Opened 10/22/2026

Texas Department of Transportation·Texas

68% match

STATE LET MAINTENANCE CONTRACT, CORYELL CO, TRAFFIC CONTROL SERVICES

Closes 11/4/2026Opened 10/8/2026

Georgia Department of Transportation·Georgia

68% match

Work Zone Temporary Traffic Control Devices

Closes 11/5/2026Opened 10/9/2026

Thruway Authority, NYS·New York

68% match

TAA 26-19B

Closes 11/18/2026Opened 10/20/2026

Texas Department of Transportation·Texas

68% match

STATE LET MAINTENANCE CONTRACT, GREGG CO, TRAFFIC CONTROL SERVICES

Closes 11/3/2026Opened 10/8/2026

Thruway Authority, NYS·New York

68% match

Toll Management Service Provider Commercial Charge Account Program

Rolling / TBD closeOpened 11/19/2025

Thruway Authority, NYS·New York

68% match

TANY 26-32

Closes 11/4/2026Opened 10/6/2026

Thruway Authority, NYS·New York

67% match

TAA 26-35

Closes 11/4/2026Opened 10/6/2026

New York State Energy Research and Development Authority·New York

67% match

The New York Truck-Voucher Incentive Program

Closes 12/31/2029Opened 7/31/2025

New York City Department of Design and Construction·New York

67% match

85026B0091 - HWX405 - SOUTHERN BOULEVARD BICYCLE AND PEDESTRIAN SAFETY IMPROVEMENTS, THE BRONX

Closes 11/5/2026Opened 5/4/2026

Miami-Dade County·Florida

67% match

Traffic Circle at NW 52nd Ave. And NW 191st St.

Closes 12/9/2026Opened 10/30/2026

Thruway Authority, NYS·New York

67% match

TAS 26-34

Closes 11/4/2026Opened 10/6/2026

Transportation, NYS Dept. of·New York

67% match

Crash Location & Engineering Analysis Repository (CLEAR) Enhancements, Maintenance and Support Services for NYSDOT

Rolling / TBD closeOpened 9/8/2026

Texas Department of Transportation·Texas

67% match

STATE LET MAINTENANCE CONTRACT, HENDERSON CO, TRAFFIC CONTROL SERVICES

Closes 11/4/2026Opened 10/8/2026

Power Authority of New York·New York

67% match

LAN CONNECTIVITY EXPANSION

Closes 11/9/2026Opened 10/19/2026

City of Rock Hill·South Carolina

67% match

SCP: Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements

Closes 11/18/2026Opened 10/9/2026

Miami‑Dade County Department of Transportation and Public Works·Florida

67% match

Traffic Circle at NW 52nd Ave. And NW 191st St.

Closes 12/9/2026Opened 10/30/2026

Texas Department of Transportation·Texas

67% match

LOCAL LET MAINTENANCE CONTRACT, HARRIS CO, TRAFFIC CONTROL SERVICES

Closes 11/10/2026Opened 10/19/2026