The Town of Milton is seeking proposals from qualified contractors for the supply and installation of aluminum ornamental fencing along a roadway frontage area. The project consists of furnishing and installing approximately 704 linear feet of black aluminum ornamental fence along the road frontage portion of St. Ann’s Cemetery. Key features of the project include:
• Height: 54 inches
• Style: 3-rail, flush bottom
• Color: Black
• Two (2) 10-foot and (2) 14-foot recessed double drive gates
The project requires all labor, materials, equipment, site preparation, and restoration for a complete installation. The desired project schedule is as follows: Project commencement: As soon as possible, Project completion: October 31, 2026.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.