The project consists primarily of the installation of tide check valves at seven different locations and the removal of an existing flap gate and a duck bill gate valve at various locations. The new valves consist of in-line check valves of varying sizes. The purpose for the installation/maintenance of check valves is to mitigate flooding during king tides. The check valves are to be installed within the storm drain system with little to no impact to the existing storm drain system.
• The project requires the installation of tide check valves at seven locations
• The project involves the removal of an existing flap gate and a duck bill gate valve
• The new valves will be installed within the storm drain system
• The project aims to mitigate flooding during king tides
• The contractor must launch their boat from a location agreed upon by the City
• The cost for the boat must be included in the cost for each check valve installation
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.