This bid seeks a contractor to fully reconstruct three sections of roadway in Milwaukee, including asphalt paving, concrete walkways, driveways, traffic islands, detectable warning fields, and related site restoration. The work must be completed by mid‑December 2026 and includes requirements for bid bonds, SBE participation, resident‑preference program compliance, apprenticeship utilization, and submission of extensive documentation (plans, specifications, and various affidavits).
• Scope: 4" asphalt roadway reconstruction, 5" concrete walk, 7" concrete driveway, traffic islands, speed humps, paving removal, grinding, and site restoration across three street segments (W. Arizona St., S. 53rd‑55th St.; S. 53rd St.‑W. Oklahoma Ave.; W. Cleveland Ave.)
• Mandatory requirements: 10% bid bond (manual or electronic), SBE participation (minimum 7%), Resident Preference (40% of worker hours), apprenticeship involvement, and numerous compliance forms (Form A, SRC affidavit, non‑collusion affidavit).
• Timeline: Advertised 09/18/2026, bid deadline 09/28/2026 11:30 AM EDT; asphalt work completed by 11/20/2026, all work by 12/18/2026.