The National Park Service is seeking a contractor to replace planks and repair pilings at Bodie Island. The contract includes work on the boardwalk and observation deck, which are supported by fiberglass pilings. The contractor will need to perform repairs to the existing structure, including replacement of deck planks and repair of damaged grass and vegetation. The contract also includes installation of ice and water shield beneath the new roofing and replacement of architectural shingles at the observation shelter. The contractor will need to ensure that all work is done in accordance with the contract documents and specifications.
Some key points to consider include:
• The contract is for the "Base Bid" work, which is defined as section 3 in the design drawings.
• The contractor will need to replace all fiberglass piles in section 3 with a new wrap.
• The contractor will need to repair or replace metal brackets and other hardware as needed.
• The contract includes a requirement for special inspections, which will need to be performed by an independent subcontractor.
• The contractor will need to ensure that all work is done in accordance with the contract documents and specifications, including requirements for materials, labor, and equipment.