Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Michigan guideMichigan Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Michigan
  4. ›Water and Wastewater
  5. ›East Pump Station (WPC-F)

City of Flint·Michigan

East Pump Station (WPC-F)

Rolling / TBD close$500k – $800kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Flint is seeking a contractor to replace water pumps at the East Pump Station of its Water Pollution Control Facility, including associated electrical conduit work, valve and pipe‑support replacement, interior painting of spool pieces, and removal of asbestos‑containing black coatings. The scope also covers demolition of existing line shafts, installation of metal plates for conduit support, and removal of pressure switches. This project requires expertise in mechanical pump installation, electrical conduit routing, hazardous‑material abatement, and industrial painting. • Replace existing water pumps with new units and install associated valves (smaller size, requiring spool pieces). • Perform conduit installation (two 2½‑in. power conduits and one 1‑in. monitoring conduit) and support them with metal plates on each floor. • Remove asbestos‑containing black coatings from pipes, valves, pumps, and support rods; include any additional testing costs in the bid. • Paint interior of all spool pieces per specification Section 09900 and replace 32 pipe‑support rods.

Attached files

Contact

Joyce McClane(Purchasing Manager)

Key dates

Opened
7/20/2022
Closes
Rolling / TBD

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
238220
Solicitation №
P19-547

Budget estimate

$500,000 – $800,000

The RFP summary lists four competing bids ranging from $515,000 to $798,000, indicating the contract value will fall within that window. Assuming a typical contractor margin of 10‑20 %, the client could expect earnings roughly between $500k and $800k, with the low end reflecting a smaller scope or tighter margin and the high end reflecting the full scope including asbestos abatement and painting.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Massachusetts Town of Nantucket·Massachusetts

Top match · 63%

IFB - Well No. 17 Pump Station Project

Closes 12/9/2026Opened 10/28/2026

Miami‑Dade County Water & Sewer Department·Florida

62% match

Pump Station 0812 Relocation and Upgrade

Closes 12/1/2026Opened 10/16/2026

City of Camden·South Carolina

61% match

Cool Springs Pump Station Replacement

Closes 11/18/2026Opened 10/19/2026

North Carolina City of Raleigh·North Carolina

61% match

EM Johnson WTP 605 High Service Pump Replacement

Closes 12/8/2026Opened 10/30/2026

City of Fort Myers·Florida

61% match

Sole Source - Xylem Water Solutions - Flygt Lift Station Pumps

Closes 11/4/2026Opened 10/14/2026

Gwinnett County Government·Georgia

61% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

City of Key West·Florida

61% match

Pump Station R Rehabilitation

Closes 11/16/2026Opened 10/15/2026

Washington Suburban Sanitary Commission, MD·Maryland

61% match

Potomac WFP Water Quality/PFAS Pilot Project

Closes 12/1/2026Opened 10/14/2026

New York City Department of Environmental Protection·New York

61% match

82626B0054-BEDC-PS-318 Reconstruction of Paerdegat Pumping Station

Closes 12/16/2026Opened 10/21/2026

U.S. Department Of Justice·Indiana

61% match

FCC TERRE HAUTE Heating Condensate Pumps

Closes 11/2/2026Opened 10/6/2026

City of San Diego·California

61% match

Pump Station 2 Improvements and Modernization (Advertisement Only : No BIDS)

Closes 12/10/2026Opened 10/28/2026

U.S. Department Of Homeland Security·Maryland

60% match

INDUSTRY DAY: WPC Work Platforms

Closes 12/26/2026Opened 12/18/2025

U.S. Department Of Defense·District of Columbia

60% match

Turbomolecular Pumping Station

Closes 10/31/2026Opened 10/27/2026

Jackson County Utility Authority·Mississippi

60% match

Pump Station #20 Rehab

Closes 11/17/2026Opened 9/20/2026

Dickenson County·Virginia

60% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

City of Stillwater·Oklahoma

60% match

Lake McMurtry Pump Station

Closes 11/11/2026Opened 8/31/2026

City of Tampa, Florida·Florida

60% match

26-C-00018 Gunlock Pump Station Force Main Replacement

Closes 11/17/2026Opened 10/16/2026

Gwinnett County Government·Georgia

60% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

New York City Department of Environmental Protection·New York

60% match

82626B0054-BEDC-PS-318 Reconstruction of Paerdegat Pumping Station

Closes 12/16/2026Opened 10/21/2026

County of Maui·Hawaii

60% match

Kihei 4 and 5 WWPS Modifications

Closes 11/2/2026Opened 10/2/2026

U.S. Department Of Defense·Ohio

60% match

Vacuum Turbo Pumps

Closes 11/13/2026Opened 10/14/2026

City of Tampa, Florida·Florida

60% match

RFQ 27-D-00003 43rd St. Pump Station Force Main Replacement Design

Closes 12/3/2026Opened 10/30/2026

Washington Enterprise Services (DES), Dept. of·Washington

60% match

WSP - FTA Fuel Farm Refurbishment

Closes 11/18/2026Opened 10/22/2026

Texas Tx Dept Crim. Justice/inst Div·Texas

60% match

Water Pumps

Closes 11/6/2026Opened 10/23/2026

New York State Energy Research and Development Authority·New York

60% match

Window Heat Pump Demonstration Program - Phase I

Closes 6/30/2027Opened 11/14/2025