Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Iowa guideIowa Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Iowa
  4. ›Civil Engineering
  5. ›Elmore Avenue Patching Project - Kimberly Road to 3838…

City of Davenport·Iowa

Elmore Avenue Patching Project - Kimberly Road to 3838 Elmore Avenue

Closes 5/6/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Davenport is inviting bids for the Elmore Avenue Patching Project, which involves full depth patching of the existing roadway, resetting of utility surface features, paint striping, topsoil, sodding, and erosion control. The project is located on Elmore Avenue from Kimberly Road to 3838 Elmore Avenue. The contract time shall be per SUDAS Section 1080-1.02, A.1, Completion Date Contracts, with an anticipated start date for construction no sooner than August 3, 2026, and completion by September 30, 2026. • The proposed improvements include furnishing of all labor, materials, and equipment necessary for the project. • The Contractor shall be responsible for ascertaining the exact location of all utilities and services from the utility companies before starting construction. • The Contractor shall provide 72-hour advance notice of all lane restrictions, street closures, and detours on the cityofdavenportiowa.com/roadwork website after pre-approval of the notice by the Engineer. • The Contractor shall conduct the work so as to create a minimum amount of inconvenience to traffic and maintain access to all residences and businesses. • The Contractor shall protect any appurtenances not scheduled to be removed and its appurtenances from damage at all times and shall repair any damaged pavement at the Contractor’s expense.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Mary Sakalosky(Purchasing Division)

[email protected]

(563) 326-7772

Key dates

Opened
4/14/2026
Questions due
4/27/2026
Closes
5/6/2026
Duration
59 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237310
Solicitation №
26-63

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work and the materials required. The project involves full depth patching of the existing roadway, which may require significant amounts of asphalt, concrete, and other materials. Additionally, the project requires resetting of utility surface features, paint striping, topsoil, sodding, and erosion control, which may also require significant labor and equipment costs. Based on these factors, the budget for this project could be in the range of $500,000 to $2,000,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Fort Wayne·Indiana

Top match · 71%

0890C - Eckart St Reconstruction: S Anthony Blvd to Winter St

Closes 11/12/2026Opened 10/29/2026

City of Cedar Rapids·Iowa

71% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026

Nevada Government·Nevada

71% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

City of Gillette·Wyoming

71% match

SAKO - KIMBER INTERSECTION IMPROVEMENTS

Closes 11/4/2026Opened 10/20/2026

Georgia DeKalb County Government·Georgia

71% match

2026-110-ITB Glenwood Sidewalk Improvement Project Phase III (24 Months)

Closes 11/6/2026Opened 10/5/2026

Municipality of Anchorage·Alaska

70% match

4th Avenue Reconstruction – G Street to E Street (Project 21‑22)

Closes 11/4/2026Opened 10/7/2026

Monroe County·New York

70% match

Traffic Signal Replacement - South Clinton Avenue at Elmwood Avenue

Closes 12/1/2026Opened 10/31/2026

City of Charlotte·North Carolina

70% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

City of Charlotte·North Carolina

70% match

Robinson Church Road Sidewalk, Brawley Lane to Jones Creek Lane

Rolling / TBD closeOpened 3/11/2026

Moore & Bruggink, Inc·Michigan

70% match

250218.01 Reconstruction of 84th Avenue and Riley Street Bike Path

Closes 11/12/2026Opened 10/27/2026

Miami-Dade County Department of Transportation and Public Works·Florida

70% match

Resurfacing of SW 152nd Avenue FM 454982-1

Rolling / TBD closeOpened 8/28/2026

City of Charlotte·North Carolina

70% match

Sharon Road at Eastburn Road Improvements

Rolling / TBD closeOpened 1/2/2026

Missouri Department of Transportation·Missouri

70% match

St. Louis District, St. Louis County, Hanley Road – Laclede Station Road between Manchester Road and Newport Avenue resurfacing, curb ramp upgrades, and traffic signal improvements

Closes 11/4/2026Opened 5/4/2026

City of Charlotte·North Carolina

70% match

Shamrock Drive Complete Street

Rolling / TBD closeOpened 4/1/2027

NYS Rochester, City of·New York

70% match

HAZARDOUS SIDEWALK REPLACEMENT PROGRAM - NORTHEAST QUADRANT CONTRACT 2027 PHASE 4

Closes 11/17/2026Opened 10/26/2026

Missouri Department of Transportation·Missouri

70% match

KC District, City of Gladstone, Improving N. Oak Trafficway from NE 69th Street to NE 72nd.

Closes 11/3/2026Opened 9/24/2026

City of Indianapolis·Indiana

70% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/9/2026

City of Fairfield·Ohio

69% match

Installation of 7,000‑ft separated shared‑use asphalt path on Pleasant Avenue (US 127) – resurfacing, storm sewer, water main, curb, retaining walls, and signalized crosswalks in Butler County, Ohio.

Closes 11/17/2026Opened 10/23/2026

NYS East Fishkill, Town of·New York

69% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

City of Cedar Rapids·Iowa

69% match

34th Street SE from North of Terry Drive to Cottage Grove Avenue

Closes 11/18/2026Opened 10/21/2026

City of Aiken·South Carolina

69% match

P043675 Abbeville Ave and Sumter St & P043676 Colleton St and Charleston Ave Intersection Improvements

Closes 11/17/2026Opened 10/8/2026

City of Stillwater·Oklahoma

69% match

10th Avenue and Main Street Improvements Project 26TR12

Closes 11/4/2026Opened 10/10/2026

City of Charlotte·North Carolina

69% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

County of DeKalb, GA·Georgia

69% match

Glenwood Sidewalk Improvement Project Phase III (24 Months)

Closes 11/6/2026Opened 10/5/2026

City of Pueblo·Colorado

69% match

Concrete Improvements - Elmwood Golf Course Cart Paths Phase 2

Closes 11/17/2026Opened 10/27/2026