The Federal Bureau of Prisons is seeking a qualified contractor to remove and dispose of water‑damaged interior finishes at four buildings within the Federal Correctional Institution in Bastrop, Texas. The work includes hazardous‑material abatement (mold, potential lead‑based paint), demolition of gypsum wallboard, ceilings, suspended ceiling systems, and wood paneling, followed by thorough containment, HEPA cleaning, and final site restoration. The contractor must provide all labor, equipment, disposal services, and comply with strict OSHA, EPA, and BOP security requirements, including background checks and badge clearance for all personnel.
• Remove ~23,500 sf of water‑damaged ½‑in. gypsum wallboard
• Remove ~5,500 sf of gypsum ceiling assemblies
• Remove ~1,100 sf of suspended ceiling systems (tiles, grid, hangers)
• Remove ~1,200 sf of water‑damaged wood paneling
• Perform hazardous‑material containment, negative‑air pressure, HEPA filtration, and disposal per federal regulations
• Provide final HEPA cleaning, site restoration, and warranty of workmanship
• Coordinate with FCI Bastrop staff and COR; adhere to strict security‑badge and background‑check procedures
• Work hours: 7:30 am – 4:00 pm, Mon‑Fri; site visits mandatory for accurate measurement (optional but strongly encouraged)
• Submission: electronic quote via email; one‑page SF 1449 quotation; deadline 09/01/2026 09:00 CT.