Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Mississippi guideMississippi Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Mississippi
  4. ›Construction
  5. ›Construction of 4.293 miles of Maintenance (Other Than…

Office of State Aid Road Construction and Pearl River County Board of Supervisors·Mississippi

Construction of 4.293 miles of Maintenance (Other Than Bridge) on State Aid Program (SAP) Project No. SAP-55(30)M

Closes 6/23/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Pearl River County Board of Supervisors is seeking bids for the construction of 4.293 miles of maintenance (other than bridge) on State Aid Program (SAP) Project No. SAP-55(30)M. The project involves various roadway items, including excavation, crushed stone, asphalt, and traffic signs. The contract will be awarded to the lowest qualified bidder based on published quantities. The project must be constructed in accordance with the latest edition of the Mississippi Standard Specifications for State Aid Road and Bridge Construction. Key aspects of the project include: • Mobilization and unclassified excavation • Installation of crushed stone, asphalt, and traffic signs • Cold milling of bituminous pavement and maintenance of traffic • Installation of thermoplastic edge stripes, traffic stripes, and legend signs • Reflectorized traffic warning signs and object markers The project duration is 75 working days, and the award will be made to the lowest qualified bidder.

Attached files

Contact

Amanda Williams

[email protected]

Key dates

Opened
6/12/2026
Closes
6/23/2026
Duration
75 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
2495-20260504154836 BSPRC

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the quantities of materials and labor required. Given the scope of work, including 4.293 miles of maintenance, the total cost may range from $500,000 to $2,000,000. This estimate is influenced by factors such as labor costs, material prices, and equipment expenses.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Texas Department of Transportation·Texas

Top match · 73%

STATE LET MAINTENANCE CONTRACT, TRAVIS CO, BRIDGE PREVENTATIVE MAINTENANCE

Closes 11/3/2026Opened 10/8/2026

Texas Department of Transportation·Texas

73% match

STATE LET MAINTENANCE CONTRACT, CHILDRESS CO, BRIDGE PREVENTATIVE MAINTENANCE

Closes 11/3/2026Opened 10/8/2026

Texas Department of Transportation·Texas

73% match

STATE LET MAINTENANCE CONTRACT, DONLEY CO, BRIDGE PREVENTATIVE MAINTENANCE

Closes 11/4/2026Opened 10/8/2026

U.S. Department Of Defense·Louisiana

72% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

72% match

Calcasieu River and Pass, LA, Maintenance Dredging FY26, Mile 5.0 to Mile 17.0, Calcasieu and Cameron Parishes, LA

Closes 6/12/2028Opened 5/28/2026

U.S. Department Of Transportation·Washington

72% match

ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements

Closes 8/12/2028Opened 8/12/2026

Texas Department of Transportation·Texas

72% match

STATE LET CONSTRUCTION CONTRACT, TERRELL CO, BRIDGE MAINTENANCE

Closes 11/3/2026Opened 10/7/2026

Texas Department of Transportation·Texas

72% match

STATE LET CONSTRUCTION CONTRACT, RANDALL CO, BRIDGE MAINTENANCE

Closes 11/3/2026Opened 10/7/2026

Texas Department of Transportation·Texas

72% match

LOCAL LET MAINTENANCE CONTRACT, DALLAS CO, BRIDGE PREVENTATIVE MAINTENANCE

Closes 11/12/2026Opened 10/15/2026

Texas Department of Transportation·Texas

72% match

STATE LET CONSTRUCTION CONTRACT, BROWN CO, PREVENTIVE MAINTENANCE

Closes 11/4/2026Opened 10/7/2026

U.S. Department Of Defense·Louisiana

72% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Transportation·Idaho

72% match

ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements

Closes 8/12/2028Opened 9/14/2026

U.S. Department Of Defense·Louisiana

72% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Transportation·Mississippi

72% match

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 11/10/2026Opened 10/8/2026

U.S. Department Of Defense·Louisiana

72% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

71% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 2/20/2028Opened 2/6/2026

California Department of Transportation·California

71% match

Construct maintenance facility and modify traffic management systems.

Closes 12/8/2026Opened 10/19/2026

Texas Department of Transportation·Texas

71% match

LOCAL LET MAINTENANCE CONTRACT, DENTON CO, BRIDGE SCOUR REPAIR

Closes 11/12/2026Opened 10/15/2026

California Department of Transportation·California

71% match

Replace bridge, widen Rdwy, railroad, drainage, Elect and landscape.

Closes 11/18/2026Opened 10/5/2026

U.S. Department Of Defense·Louisiana

71% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024

City of Rancho Cordova·California

71% match

Bridge Preventative Maintenance Repair At Horn Road

Closes 11/2/2026Opened 10/8/2026

U.S. Department Of Defense·Louisiana

71% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Transportation·Maine

71% match

Acadia National Park

Closes 11/10/2026Opened 10/9/2026

U.S. Department Of Defense·Pennsylvania

71% match

Preventative Maintenance and Repair of Heavy Equipment for the Fort Mifflin Project Office

Closes 11/23/2026Opened 9/30/2026

Virginia Department of Transportation·Virginia

71% match

B34_2027 BRIDGE REHABILITATION

Closes 11/18/2026Opened 10/13/2026