Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›Tree Assessment

People with Developmental Disabilities, NYS Office for·New York

Tree Assessment

Closes 2/23/2026$50k – $1.5MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Trees to be removed, no pruning, topping, or branch cuts. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 30 days of award, unless modified below. This is a NYS Public Works project, and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned, and all materials secured at the end of each workday. Absolutely no scraps, branches, limbs, cut wood, are to be left unsecured. Upon completion, before removal of equipment and/or scaffolding, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent or authorized AHJ SCOPE OF WORK includes, but is not necessarily limited to the following: 1. Contractor shall verify the actual measurements and condition of work to be done to ensure a complete and accurate job. Contractor to supply all labor, material, and equipment to complete work. 2. The construction area must be marked off and on-site vehicle traffic controlled at all times. 3. All branches’ limbs or otherwise shall be removed via, chipper truck, or other, 4. Contractor is responsible to remove and dispose of all debris on daily basic and at the end of the project. All work must not interfere with day-to-day operation. 5. Work area must be clean, and all tools/materials removed for safety by 4 pm each day. 6. All stumps to be removed where possible. 7. Stumps that can’t be removed must be stump grinded. 8. Trees set for removal are listed by type and location. Please see attached. This specification subject to be amended as required. GENERAL REQUIREMENTS: Facility: SIDDSO Facility Address: Various Point of Contact: Stanley Jakubowski MS2 off- 718 983 5336 Point of Contact: Jose Lugo MS3 Off- 718 983 5336 Project Title: Tree removal Summary of Work: Tree removal various sites 1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up. Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor. 2. Work is to be done between the hours of 8:30AM and 4:00PM, Monday through Friday. Contractor is advised that these areas can be an unoccupied or occupied at any time during construction and all items to be adhered to. 3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday. 4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery. 5. Smoking is prohibited by contractors at all residential and program sites owned by OPWDD 6. Vendor is responsible for the removal and discarding, off site, all debris, limbs, branches, and areas are to be blown free of any debris at the end of each phase. 7. Prior to the commencement of the work, there shall be a meeting with Region 5 DDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period. 8. The NYS OPWDD SIDDDSO Region 5 Office reserves the right to pre-approve all Sub-contractors. Any Contractor intending to use sub-contractors must provide the NYS OPWDD SIDDDSO Region 5 Business Office with all sub-contractor’s contact information, in writing, prior to the determination of approval. 9. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property. 10. All warranties, guarantees and written documents to be supplied to SIDDSO Plant Superintendent or Code Enforcement Official (AHJ for closing) prior to final payment of project. SITE VISIT A site visit is mandatory. The site visit date is scheduled for February 10th, 2026, at 11:00am at the project site. All prospective bidders are encouraged to attend. NO repetitive oratory performed after15 minute late vendor arrival. All questions to be forwarded to Business Office for answering to all vendors. A. Lawn Damage/Property Damage · If the delivery of materials or any other work necessitates the contractor, his suppliers, or sub-contractors to drive on the lawn for ANY reason, the contractor shall be held responsible for the repair of the lawn. · Personal vehicles are not to be parked on the grass. · Any property damage caused by work performed is to be corrected to the condition existing prior to start of the job. B. Continuity of Work/Communication/Scheduling · Once the job has begun, it is to be worked on continuously until completed. · If there are any delays, even if due to inclement weather, a Work Control Representative MUST be contacted. · Work must be completed within 30 days of receiving the purchase order. C. House Safety · The residence or program area will be occupied during the job. · The contractor must take all reasonable care to safeguard the residents and the staff. · The contractor shall ensure all tools, materials and other items are picked up, removed or stored and are safely secured at the end of each workday. · Any ladders, scaffolding or lifts used in conjunction with this job are to be removed at the end of the day. · The work as indicated above shall be scheduled as not to interfered with other functions of the residence or program. All work performed as part of this job is to be coordinated with Maintenance Supervisors and Plant Superintendent listed above. Location & Tree type Stage 1 - 1150 Forest Hill Road Off Forest Hill Road, against fence, batting cages Pine 16" Opposite 11 N Apple 13’ 50 J Front Ash 40’ 47F Front Maple 22’ 48 C-D Rear Oak 34’ 48 B Front Maple 30’ Stage 2 - 1100 Forest Hill Road 53 C Front (caution tape) Maple 12.5’ 53 C (behind fence) Ailanthus 12’ 53 C (behind fence) Ailanthus 16’ Stage 3 - 930 Willowbrook Road 17 H Front (Lifestyles Cafe) Maple 21’ 17 H Back Maple 22’ 12 G Front Maple 25’ 12 G Rear Maple 26’ 2 Avenue / B Street Maple 22’ 3 Avenue (Avenue B-Avenue C Right Side) Oak 24’ 3 Avenue Oak 23’ 28 D Rear (Left Side Roadway) Pine 19’ 28 D Rear Ash 13’ Opposite 41 A Pine 19’ 16 C Oak 31.5’ Business enterprises awarded an identical or substantially similar procurement contract within the past five years: None

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Vanessa Johnson(Contract Management Specialist)

[email protected]

(718) 983-5441

Key dates

Opened
1/15/2026
Closes
2/23/2026
Duration
1 year

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
561730
Solicitation №
0001

Budget estimate

$50,000 – $1,500,000

The budget for this opportunity is estimated to be between $50,000 and $1,500,000, as specified in the document as an MWBE or SDVOB Discretionary procurement. The actual budget will depend on the vendor's bid and the scope of work required to complete the project. Factors that may influence the likely payment range include the number of trees to be assessed, the complexity of the work, and the vendor's labor and material costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of North Augusta·South Carolina

Top match · 68%

Tree Canopy Mapping Service

Closes 11/12/2026Opened 10/12/2026

City of North Augusta·South Carolina

68% match

Tree Canopy Mapping

Closes 11/12/2026Opened 10/12/2026

Dept of Natural Resources·Wisconsin

68% match

Tree Common Stand Exam FFY2027

Closes 11/13/2026Opened 10/28/2026

Nevada Government·Nevada

68% match

IFB 116-27 Tree Inventory & Analysis

Closes 11/5/2026Opened 10/22/2026

East Bay Municipal Utility District·California

67% match

Local Watershed Tree Planting Maintenance and Monitoring

Closes 11/17/2026Opened 10/14/2026

City of Charlotte·North Carolina

67% match

Tree Canopy Action Plan

Rolling / TBD closeOpened 10/18/2025

Georgia City of Pooler·Georgia

66% match

Tree Canopy Coverage Assessment Contract Services

Closes 11/6/2026Opened 10/7/2026

City of Sidney·Ohio

65% match

Sidney 2026 Tree Purchasing & Planting (Tree Lottery)

Closes 11/5/2026Opened 10/19/2026

City of Sidney·Ohio

65% match

2026 Robert O New Park Conservation Area Tree Planting

Closes 11/5/2026Opened 10/26/2026

City of Pittsburgh·Pennsylvania

64% match

PQ List for Tree Planting

Closes 3/31/2030Opened 4/23/2026

Massachusetts Department of Conservation and Recreation·Massachusetts

64% match

Grant - UCF Tree Canopy Enhancement Grant Program

Closes 11/2/2026Opened 8/31/2026

City of Brooklyn Park·Minnesota

64% match

2026-2027 Tree Removal

Closes 11/4/2026Opened 10/29/2026

Massachusetts Mohawk Trail Hawlemont Regional School District·Massachusetts

64% match

Comprehensive Property Condition Assessment and Long-Range Capital Planning Analysis

Closes 11/2/2026Opened 10/19/2026

County of Riverside·California

63% match

Tree Maintenance and Tree Pest Management Services

Closes 11/12/2026Opened 10/21/2026

Commonwealth of Kentucky·Kentucky

63% match

Tree Seedling Harvester

Closes 11/13/2026Opened 10/26/2026

Nebraska State Purchasing Bureau·Nebraska

63% match

InterRAI Assessment Evaluation

Closes 12/9/2026Opened 10/16/2026

Town of Norwich·Vermont

63% match

Town of Norwich - Roadside Hazardous Tree Removal Project

Closes 11/23/2026Opened 10/26/2026

Maryland Department of Public Works·Maryland

63% match

Tree Removal

Closes 11/10/2026Opened 10/1/2026

Connecticut Town of Greenwich·Connecticut

63% match

Tree Supplier for The Town of Greenwich

Closes 11/12/2026Opened 10/22/2026

Connecticut Town of Westport·Connecticut

63% match

Tree Removal and Emergency Tree Maintenance

Closes 11/20/2026Opened 10/28/2026

State of Alaska Department of Natural Resources, Division of Forestry & Fire Protection·Alaska

63% match

Northwest Coffman Timber Sale Draft Forest Land Use Plan (SSE-1395-K)

Closes 11/9/2026Opened 10/9/2026

Missouri Department of Conservation·Missouri

63% match

Woodson K. Woods Memorial CA Compartment 5 TSI

Closes 11/2/2026Opened 10/23/2026

City of Cincinnati·Ohio

63% match

Citywide Replacement Tree Planting

Closes 11/10/2026Opened 9/30/2026

Massachusetts Department of Transportation·Massachusetts

63% match

616509 DISTRICT 6 Scheduled & Emergency Tree Trimming & Sight Distance Improvement at Various Loca

Closes 11/3/2026Opened 10/5/2026

Cincinnati Parks·Ohio

63% match

Citywide Replacement Tree Planting

Closes 11/10/2026Opened 10/28/2026