The North Texas Tollway Authority (NTTA) is seeking competitive bids to remove existing pavement markings and replace them with new 100‑mil thermoplastic markings, raised pavement markers, rumble strips, and associated traffic‑control devices along the Dallas North Tollway segment from the President George Bush Turnpike (PGBT) to Sam Rayburn Tollway (SRT) and across the Lewisville Lake Toll Bridge (LLTB). The work is limited to surface‑level restriping and traffic‑control installation; no major civil or structural construction is included. The contract will be awarded on a lowest‑responsible‑bid basis and must be completed within 150 calendar days of the notice‑to‑proceed.
• Scope: removal of existing markings, adhesive residues, and RPMs; installation of new thermoplastic lane lines, raised markers, rumble strips, shields, and all required signage/traffic‑control devices.
• Location: Dallas North Tollway (PGBT → SRT) and Lewisville Lake Toll Bridge, Collin & Denton Counties, Texas (≈ 7.5 mi).
• Schedule: bid opening 19 Nov 2026, bid due 19 Nov 2026 11:00 AM CT; work must be finished within 150 days (≈ 5 months).
• Requirements: $50 000 bid bond, appropriate insurance, performance bond, 5 % retainage, 10 % small‑business participation goal, TxDOT pre‑qualification and ITS technical qualification, compliance with Texas DOT material specs.
Attached files
Contact
Milad Muhammad Qasim(Senior Procurement Specialist)
You found this one. Bid Banana has 1.6M+ bids and awards.
You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.