Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Nebraska guideNebraska Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Nebraska
  4. ›Construction
  5. ›Culvert Maintenance 2025 (Phase I) (25-23) (Co. Engineer)

City of Lincoln·Nebraska

Culvert Maintenance 2025 (Phase I) (25-23) (Co. Engineer)

Closes 10/31/2025$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Lancaster County Engineering Department is seeking bids for the Culvert Maintenance 2025 (Phase I) project. The project involves the installation of culvert pipes of various sizes and types under high-speed roadways, including excavation, bedding, placement of pipe and/or headwalls, backfill, compaction, and roadway grading. The contractor must demonstrate their responsibility to perform the work through prequalification, prior work experience, or similar work completed. The project includes multiple sites, and the contractor will be required to complete the work within the allocated number of working days per site. Key aspects of the project include: • Culvert installation and repair • Erosion and sedimentation control measures • Rock riprap and bedding • Headwall construction and repair • Concrete culvert pipes • Adjustment of drain tiles and rodent guards The contractor will be responsible for maintaining traffic control, providing barricades and signs, and ensuring the safety of the public and workers. The project is expected to commence on or after April 1st, 2026, and the contractor will be required to complete the work within 88 working days.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Brianne Pallard(Purchasing Agent)

[email protected]

(402) 441-8314

Key dates

Opened
10/17/2025
Questions due
10/27/2025
Closes
10/31/2025
Duration
88 working days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
25-188

Budget estimate

$500,000 – $2,000,000

Based on the project scope and the fact that it involves multiple sites and various construction activities, the estimated budget for this project could range from $500,000 to $2 million. This estimate takes into account the costs of materials, labor, equipment, and other expenses associated with culvert installation, erosion control, and traffic management. However, the actual budget may vary depending on the complexity of the project, the number of sites, and the bidder's experience and qualifications.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Ladue·Missouri

Top match · 77%

2025 Culvert Repairs Project - Ladue, MO

Closes 11/5/2026Opened 10/6/2026

Virginia Department of Transportation·Virginia

74% match

B32_ 2027 CULVERT REHAB

Closes 11/18/2026Opened 10/13/2026

Georgia City of Covington·Georgia

74% match

2026-27 Three Ring Access Road Culvert Improvements

Closes 12/1/2026Opened 10/26/2026

City of Sidney·Ohio

74% match

26-26 Brookside Park Culvert

Closes 11/5/2026Opened 10/21/2026

Oregon Department of Transportation·Oregon

74% match

US199 @ Demaray Dr MP 2.33 Culvert Replacement Project

Closes 11/11/2026Opened 10/27/2026

Park County Public Works·Wyoming

74% match

Willwood Road Improvements Project- Phase 2 Culverts

Closes 11/16/2026Opened 10/16/2026

City of Charlotte·North Carolina

73% match

Collective Culverts 1 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/11/2028

St. John the Baptist Parish Government·Louisiana

73% match

Bid 2026.23 Culverts and Drainage Improvements Project

Closes 11/19/2026Opened 10/21/2026

Massachusetts Town of Brewster·Massachusetts

73% match

Culvert & Bank Stabilization work

Closes 11/5/2026Opened 9/23/2026

Massachusetts City of Gardner·Massachusetts

73% match

2027-011 Keyes Road Culvert Replacement

Closes 11/5/2026Opened 10/7/2026

Town of Manchester·Connecticut

72% match

ENGINEERING SERVICES - DRY BROOK CULVERT REPLACEMENT

Closes 11/10/2026Opened 10/13/2026

Saline County·Kansas

72% match

2027 Roadway Materials - Pipe Culverts

Closes 11/10/2026Opened 10/9/2026

Snohomish County·Washington

72% match

2027 123rd Ave NE Culvert Replacements – RR48109, WC8109, UPI 21-20028

Closes 11/3/2026Opened 9/30/2026

City of Sidney·Ohio

72% match

Brookside Park Culvert

Closes 11/5/2026Opened 10/21/2026

Agency of Transportation - Contract Administration·Vermont

72% match

Bridgewater ER P23-1(424)

Closes 11/20/2026Opened 10/28/2026

NYS Phelps, Town of·New York

72% match

Culvert Replacement Project Melvin Hill Road over Tributary to Canandaigua Outlet

Closes 11/10/2026Opened 10/20/2026

U.S. Department Of Defense·New Hampshire

71% match

Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH

Closes 11/23/2026Opened 10/21/2026

Maryland State Highway Administration·Maryland

71% match

BCS 2026-01 Construction Inspection of Fixed and Movable Bridges, Culverts, Retaining Walls, and Other Structures, Statewide

Closes 12/2/2026Opened 10/22/2026

New York State Department of Transportation·New York

71% match

D265814 CULVERT REPLACEMENTS - Route 22 and Route 67 Culverts in the Towns of Ballston, Milton & Willsboro.

Closes 11/12/2026Opened 10/20/2026

NYS Cambria, Town of·New York

71% match

Baer Road Culvert Over East Branch of Twelve Mile Creek

Closes 11/5/2026Opened 10/9/2026

Waupaca County Highway Department·Wisconsin

71% match

Culvert CTH Q Bid

Closes 11/17/2026Opened 10/26/2026

Saline County·Kansas

71% match

2026 Pipe Lining Project

Closes 11/24/2026Opened 10/19/2026

Connecticut Town of Wethersfield·Connecticut

71% match

IMPROVEMENTS TO COPPERMILL RD CULVERT ALONG GOFF BROOK

Closes 11/6/2026Opened 10/9/2026

Spartanburg County Government·South Carolina

71% match

Walnut Church Hill Road Culvert Replacement

Closes 11/10/2026Opened 10/7/2026

West County Wastewater·California

71% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026