Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›Construction
  5. ›West Fourth Street Drainage Improvements (PE25193)

Georgia City of Springfield·Georgia

West Fourth Street Drainage Improvements (PE25193)

Closes 1/7/2026$100k – $200kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Springfield is seeking bids for the construction of West Fourth Street Drainage Improvements. The project involves installing 208 LF 24” RCP, 24” FES, and grate inlets, as well as filling 24” CMP with flowable fill, grading, silt fence, inlet protection, removing and replacing asphalt, traffic control, and grassing. The time allotted for completion of work is sixty calendar days. The funding for the project is provided by the City of Springfield. • The project requires the installation of storm drainage systems • The contractor must comply with E-Verify regulations • The owner reserves the right to reject any or all bids • The project is expected to be completed within 60 calendar days • The contractor must provide a bid bond or certified cashier’s check in an amount not less than 10% of the base bid

Attached files

Contact

Lindsey Bashlor(Buyer Contact)

[email protected]

(912) 764-7722

Key dates

Opened
12/5/2025
Closes
1/7/2026
Duration
60 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
PE25193

Budget estimate

$100,000 – $200,000

The budget for this project can be estimated based on the scope of work and the materials required. The installation of 208 LF 24” RCP, 24” FES, and grate inlets, as well as filling 24” CMP with flowable fill, grading, silt fence, inlet protection, removing and replacing asphalt, traffic control, and grassing, is a significant construction project. The cost of materials, labor, and equipment rental will likely be substantial. Assuming an average cost per linear foot of $500-$1000 for storm drainage systems, the total cost of the project could be in the range of $100,000 to $200,000. However, this is a rough estimate and the actual budget could be higher or lower depending on various factors, including the contractor's expertise, the complexity of the project, and the local market conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of South Miami·Florida

Top match · 73%

DRAINAGE IMPROVEMENTS PROJECT AT SW 65 STREET AND SW 65 TERRACE

Closes 12/1/2026Opened 10/27/2026

Town of South Hill·Virginia

72% match

Drainage Improvements: W. Atlantic St. - Mathews St.

Closes 11/4/2026Opened 10/1/2026

The Village of Royal Palm Beach·Florida

72% match

Heron Parkway Drainage Improvements PW1903

Closes 11/10/2026Opened 10/15/2026

Miami‑Dade County Department of Transportation and Public Works·Florida

72% match

Drainage Improvements Multiple Sites

Closes 12/2/2026Opened 10/23/2026

City of Valdosta·Georgia

71% match

Lakeland Avenue Drainage Improvements

Closes 12/1/2026Opened 8/27/2026

Miami-Dade County·Florida

71% match

Drainage Improvements Multiple Sites

Closes 12/2/2026Opened 11/6/2025

City of McCook·Nebraska

71% match

South 3rd Street Water System Improvements

Closes 11/10/2026Opened 10/21/2026

Municipality of Anchorage·Alaska

71% match

4th Avenue Reconstruction – G Street to E Street (Project 21‑22)

Closes 11/4/2026Opened 10/7/2026

City of Charlotte·North Carolina

71% match

Four Mile Creek Rd 9427 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/9/2026

City of South Miami·Florida

71% match

DRAINAGE IMPROVEMENTS PROJECT AT SW 65 STREET AND SW 65 TERRACE

Closes 12/1/2026Opened 10/27/2026

City of DeLand·Florida

70% match

2024 Downtown South Water Main Improvements-East Phase

Closes 11/17/2026Opened 10/13/2026

Maryland Baltimore City Department of Public Works·Maryland

70% match

Drainage Repairs and Improvements at Various Locations

Closes 11/4/2026Opened 10/7/2026

Kossuth County Drainage District No. 20 Main 2·Iowa

70% match

Kossuth County Drainage District No. 20 Main 2 Tile Improvement BMI Project No. 25X.138901

Closes 11/17/2026Opened 10/29/2026

City of Fargo·North Dakota

70% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

City of Stillwater·Oklahoma

70% match

Roadway and Utility Improvements for Knoblock Street, 4th Avenue and Lincoln Street Project Number: 25TR04

Closes 11/17/2026Opened 10/17/2026

City of Charlotte·North Carolina

70% match

Pella Rd 6212 Project Storm Drainage Improvement Project

Rolling / TBD closeOpened 7/4/2026

City of Charlotte·North Carolina

70% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

City of Charlotte·North Carolina

70% match

Valleybrook Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/15/2027

City of Charlotte·North Carolina

70% match

Hill Street Storm Drainage Improvement Project

Rolling / TBD closeOpened 8/15/2027