The US Army Corps of Engineers is soliciting bids for the Atchafalaya River Bay, Bar, and Crewboat Cut Cutterhead Dredge No. 4-2024 project. The project involves furnishing one fully crewed and equipped hydraulic pipeline cutterhead dredge for the removal and satisfactory disposal of shoal material in the Atchafalaya River Bay, Bar, and Crewboat Cut Channel. The magnitude of construction is between $10,000,000 and $25,000,000. The contractor must provide a dredge that meets the equipment requirements stated in the specification, and the dredge must have performed at or above the listed production rate for at least 85 percent of the total contract duration on any contracts used to prove plant capability within three years prior to the bid opening date.
• The project requires the contractor to provide a fully crewed and equipped hydraulic pipeline cutterhead dredge.
• The contractor must meet the equipment requirements stated in the specification.
• The contractor must have experience with similar projects and meet the production rate requirements.
• The project involves the removal and disposal of shoal material in the Atchafalaya River Bay, Bar, and Crewboat Cut Channel.
• The contract duration is approximately 58-73 days for the base item and an additional 58-73 days if the option item is fully exercised.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.