The San Francisco International Airport is seeking bids for a contract to provide as-needed services for preventative maintenance, inspection, repair, and testing of back-up generators, fuel tanks, ATS/load banks, and fuel systems. The contract duration is 5 years, and the estimated cost of construction is between $2,000,000 and $5,000,000. The contract requires a California Class "A" General Engineering Contractor license, and the Local Business Enterprise (LBE) subcontracting requirement is 20%.
• The contract includes preventative maintenance, inspection, repair, and testing of portable generators, stationary generators, underground storage tanks, above ground storage tanks, diesel pumping systems, automatic transfer switches, and load banks.
• The contract requires compliance with San Francisco Administrative Code Chapter 6, Public Works Contracting Policies and Procedures.
• The contract includes requirements for bid security, performance bonds, and payment bonds.
• The contract requires compliance with all applicable local, state, and federal regulations, including the NFPA 70E and OSHA electrical safety standards.