The City of Charleston, WV, is soliciting bids for the Capital Connector Construction Project, a multi‑modal corridor improvement along Kanawha Boulevard East (U.S. Route 60) and Greenbrier Street. The scope includes full‑depth asphalt pavement replacement, removal and reconstruction of median curbs, installation of a shared‑use path, drainage upgrades (new storm inlets, bioswales, under‑drains), utility relocations, signal pole relocations, sidewalk and curb replacements, and installation of site furnishings such as benches, lighting, restrooms, and transit shelters. The project is funded largely by a federal RAISE grant and must comply with Davis‑Bacon prevailing‑wage rules, Buy‑America requirements, and a 548‑day contract schedule.
• Roadway reconstruction (≈ 3.25 mi) with lane reductions and new pavement.
• Drainage and storm‑water infrastructure (HDPE pipes, bioswales, inlets, manholes).
• Utility coordination, signal relocation, and pedestrian/bicycle path construction.
• Site improvements including sidewalks, curb ramps, lighting, benches, restrooms, and transit shelters.