The Oregon Department of Transportation is seeking bids for the R2 Paving RFB - US20 and OR126E Overlay Paving project. The project involves paving and resurfacing of highways and roads. The contractor will be required to utilize agency-provided material sources and staging areas. The project includes requirements for blasting, asphalt concrete pavement, and pavement smoothness. The contractor will be responsible for ensuring that the pavement surface meets the specified smoothness requirements and for performing corrective work if necessary.
• The project requires the contractor to use agency-provided material sources, including the Hogg Rock Quarry.
• The contractor must comply with all applicable laws and regulations, including mining and fire laws.
• The contractor must provide wildland firefighting equipment and maintain a safe work zone.
• The contractor must ensure that the pavement surface meets the specified smoothness requirements.
• The contractor will be responsible for performing corrective work if the pavement surface does not meet the specified smoothness requirements.