Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Mississippi guideMississippi Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Mississippi
  4. ›Construction
  5. ›Reroofing the Existing Flowood Fire Station No. 1

Mississippi City of Flowood·Mississippi

Reroofing the Existing Flowood Fire Station No. 1

Closes 3/5/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Flowood is seeking bids for the reroofing of Fire Station No. 1, including a full membrane system and a sheet metal coping system. The project consists of the reroofing of the existing fire station, and the total contract time will be 60 consecutive calendar days. The liquidated damages will be $600.00 per consecutive calendar day thereafter. • The project requires the furnishing of all labor and materials for the construction of the reroofing project. • A non-mandatory inspection trip for prospective bidders is scheduled for February 18, 2026. • Bids shall be irrevocable for a period of sixty (60) days after submission, and bid security in the form of a bid bond shall be required in a sum no less than five (5) percent of the bid amount. • The city reserves the right to accept or reject any and all bids.

Attached files

Contact

Nathan Harvell

[email protected]

Key dates

Opened
2/9/2026
Pre-bid meeting
2/18/2026
Site visit
2/18/2026
Closes
3/5/2026
Duration
60 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
2502-20260203135623

Budget estimate

$200,000 – $500,000

The budget for this project is estimated to be between $200,000 and $500,000, based on the scope of the project and the materials required. The project involves the reroofing of a fire station, which is a moderate-sized construction project. The cost of materials, labor, and equipment will likely be significant, but the project is not large enough to require a massive budget. The estimated budget range is based on industry standards for similar construction projects.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Missoula·Montana

Top match · 74%

MFD Station #1 HVAC Remodel

Closes 12/8/2026Opened 10/19/2026

City of Lynchburg·Virginia

73% match

LYNCHBURG FIRE STATION 1 RENOVATION

Closes 11/17/2026Opened 10/20/2026

City of Redlands·California

71% match

REBID: Fire Station 263 Bathroom Remodel

Closes 11/10/2026Opened 10/26/2026

Miami-Dade County Fire Rescue·Florida

70% match

MDFR Fire Station 35 New Four-Fold Xt Exterior Doors

Closes 11/12/2026Opened 10/16/2026

City of Lynchburg·Virginia

70% match

2027-026 LYNCHBURG FIRE STATION 1 RENOVATION

Closes 11/17/2026Opened 10/20/2026

City of Tracy·California

69% match

Fire Station 91 Remodeling and Improvement Project

Closes 12/3/2026Opened 10/30/2026

Chennault International Airport Authority·Louisiana

69% match

Firewater Pumphouse #2 (FWPH) Firewater Storage Tanks 1 & 2 Repairs, Recoat, and Controls Upgrade (Project #2026-03)

Closes 11/17/2026Opened 10/13/2026

City of Tracy·California

69% match

Fire Station 91 Remodeling and Improvement Project

Closes 12/3/2026Opened 10/30/2026

City of Winston Salem·North Carolina

69% match

Fire Station Laundry Upgrades 2026

Closes 11/10/2026Opened 10/14/2026

City of Coronado·California

69% match

First Street Stormwater Pump Station Flood Relief Project

Closes 11/9/2026Opened 9/23/2026

City of Goose Creek·South Carolina

68% match

Request for Proposals Fire Station II Bathroom Renovations

Closes 11/6/2026Opened 10/2/2026

Town of Dixfield·Maine

68% match

RFP for Fire Station Boiler- Town of Dixfield

Closes 11/20/2026Opened 10/21/2026

Georgia City of Milton·Georgia

68% match

ITB 27-FD01, Fire Station Bay Door Replacement Project

Closes 11/4/2026Opened 10/15/2026

City of Rockford·Illinois

68% match

EMERGENCY GENERATOR REPLACEMENT AT FIRE STATION 8 AND NEWBURG RD. TRANSMITTER SITE

Closes 11/12/2026Opened 10/16/2026

Massachusetts Town of Belchertown·Massachusetts

68% match

HVAC Upgrades Belchertown Fire Station

Closes 11/13/2026Opened 10/28/2026

Albemarle County·Virginia

68% match

MONTICELLO FIRE STATION 11 RENOVATION AND HVAC REPLACEMENT

Closes 11/17/2026Opened 10/21/2026

City of Branson·Missouri

68% match

RFP 2890-02 Fire Station 2 Radiant Heating System

Closes 11/4/2026Opened 10/5/2026

City of Flowood·Mississippi

67% match

Flowood Underwood Auditorium

Closes 11/12/2026Opened 10/7/2026

Bedford County·Virginia

67% match

(2027-3) IFB: HYBRID FIRE EXTINGUISHING SYSTEM INSTALLATION

Closes 11/9/2026Opened 10/2/2026

Gwinnett County Government·Georgia

67% match

Gwinnett County Fire Station #18 Roof Replacement Project

Closes 12/3/2026Opened 10/19/2026

Greater Cleveland Regional Transit Authority·Ohio

67% match

Dry Fire Piping System Replacement – Hayden District

Closes 11/23/2026Opened 10/19/2026

Massachusetts Easthampton Housing Authority·Massachusetts

67% match

Easthampton Fire Alarm (FA) Upgrade 667-1, 2 & 3

Closes 11/20/2026Opened 10/28/2026

County of Marin·California

67% match

Marin City Fire Station Dormitory Reconfiguration

Closes 11/5/2026Opened 10/15/2026

DOC - Architecture and Engineering·Virginia

67% match

Beaumont Correctional Center Sprinkler Replacement

Closes 11/18/2026Opened 10/5/2026

City of Charlotte·North Carolina

67% match

Firehouse 44

Rolling / TBD closeOpened 1/1/2026