Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Z--GAOA FINALE DAM RECONSTRUCTION

U.S. Department Of The Interior·Colorado

Z--GAOA FINALE DAM RECONSTRUCTION

Closes 3/31/2026$5M – $15MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves the reconstruction of Finale Dam located in Valley County, Montana. The major items of work include dewatering the reservoir and construction area, excavating a portion of the existing dam embankment and foundation, reconstructing the dam embankment, and constructing precast concrete outlet works. The contractor will be responsible for obtaining and maintaining the Storm Water Discharge Permit and preparing a Stormwater Pollution Prevention Plan. The project requires the contractor to provide construction staking, perform measurements and computations, and maintain primary control points. The contract price will cover all work shown on the drawings and required by the specifications. Some key features of the project include: • Dewatering the reservoir and construction area • Excavating a portion of the existing dam embankment and foundation • Reconstructing the dam embankment • Constructing precast concrete outlet works • Obtaining and maintaining the Storm Water Discharge Permit • Preparing a Stormwater Pollution Prevention Plan • Providing construction staking and performing measurements and computations • Maintaining primary control points

Attached files

Contact

Ian Petersen(Contracting Officer)

[email protected]

(720) 812-0082

Key dates

Opened
11/14/2025
Closes
3/31/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
140L0625R0015

Budget estimate

$5,000,000 – $15,000,000

The budget for this project can be estimated based on the scope of work, which includes reconstruction of the dam embankment, construction of precast concrete outlet works, and other related activities. The total budget can range from $5 million to $15 million, considering the complexity of the project and the materials required. The actual budget will depend on the bids received and the final contract price. Factors that may influence the budget include the cost of materials, labor, equipment, and permits, as well as any potential changes to the project scope or timeline.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Agriculture·Utah

Top match · 65%

GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest

Closes 11/20/2026Opened 10/5/2026

U.S. Department Of Defense·Kentucky

65% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

State of Michigan – Department of Technology, Management and Budget (DTMB)·Michigan

64% match

751/26331.SAA; Hadley SRA - Minnawanna Dam Improvements

Closes 12/2/2026Opened 10/19/2026

U.S. Department Of The Interior·Nevada

64% match

Z--CABLEWAY CRANE REFURBISHMENT

Closes 12/18/2026Opened 3/3/2026

U.S. Department Of The Interior·Nevada

64% match

Z--CABLEWAY CRANE REFURBISHMENT

Closes 12/18/2026Opened 8/11/2026

U.S. Department Of The Interior·Wyoming

63% match

Z--YELL 338223 - Bridge Preservation

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of The Interior·Utah

63% match

Z--DINO REPLACE SWING ARM GATES

Closes 11/18/2026Opened 9/23/2026

Borough of Eatontown·New Jersey

63% match

Notice to Bidders - Revised - Wampum Lake Dam Rehabilitation - Bid Opening November 13, 2026

Closes 11/13/2026Opened 10/5/2026

City of San Diego·California

63% match

Murray Dam Near Term Repairs - Advertisement Notice Only (no bids)

Closes 12/1/2026Opened 10/6/2026

Gwinnett County Government·Georgia

63% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

State of Michigan – Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design and Construction Division·Michigan

63% match

751/26612.MAA; Various Dams - Engineering Studies

Closes 12/3/2026Opened 10/22/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

63% match

DGS 142‑8, PH 1 – Dam Removal – Ryerson Station State Park

Closes 11/12/2026Opened 10/14/2026

U.P. Engineers & Architects, Inc·Michigan

62% match

Adams Township Water Tank

Closes 11/24/2026Opened 10/30/2026

Commonwealth of Kentucky·Kentucky

62% match

RFB-105-27 Big Bone Lake Dam Decommissioning

Closes 12/2/2026Opened 10/27/2026

U.S. Department Of Agriculture·South Dakota

62% match

GAOA Grizzly Bear Campground

Closes 11/5/2026Opened 10/8/2026

U.S. Department Of Agriculture·Wyoming

62% match

4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming

Closes 11/17/2026Opened 9/30/2026

Georgia Fayette County Board of Commissioners (Purchasing Department)·Georgia

62% match

27043-B: Lake McIntosh Dam Structural Repairs

Closes 11/19/2026Opened 10/13/2026

Lower Platte North Natural Resources District·Nebraska

62% match

LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT WAHOO CREEK WATERSHED SITE 77

Closes 12/2/2026Opened 9/18/2026

Georgia Gwinnett County·Georgia

62% match

BL148-26, Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

Borough of Eatontown·New Jersey

62% match

Notice to Bidders - Wampum Lake Dam

Closes 11/5/2026Opened 10/5/2026

Gwinnett County Government·Georgia

62% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

U.S. Department Of Veterans Affairs·Wisconsin

62% match

Z2DA--Repair Bldg. 111 Concrete Facade 695-22-121 IFB

Closes 12/22/2026Opened 9/23/2026

U.S. Department Of Defense·Pennsylvania

62% match

JP Murtha Float Mooring Bitts Retrofit

Closes 11/15/2026Opened 9/1/2026

Wyoming State Construction Department·Wyoming

61% match

Clark's Fork Fish Hatchery Residence #5 Roof Replacement - Wyoming Game & Fish Department

Closes 11/20/2026Opened 10/20/2026

Navajo Nation·Arizona

61% match

Proposal for the Tohatchi Diversion Project

Closes 11/20/2026Opened 9/16/2026