Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Kansas guideKansas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Kansas
  4. ›Construction
  5. ›Lift Station Improvements - Palmer, KS

City of Palmer, Kansas·Kansas

Lift Station Improvements - Palmer, KS

Closes 1/21/2026$300k – $800kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Palmer is seeking bids to replace and upgrade its existing lift station. The scope includes demolition of the current dry‑well lift station, construction of a new top‑mounted wet‑well lift station with a concrete pad, installation of site piping, valves, and fittings, connection to the existing 4‑inch force main, electrical work, a bypass pumping system, and a standby generator with automatic transfer switch. The project will be performed on‑site in Palmer, KS and requires coordination with municipal utilities and compliance with local construction standards. • New top‑mounted wet‑well lift station with concrete pad • Complete site piping, valve, and fittings installation, including connection to existing force main • Electrical work, bypass pump, standby generator with ATS, and demolition of existing structures

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Dan Stack(Engineer)

[email protected]

Key dates

Opened
12/16/2025
Closes
1/21/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
23.4.0079

Budget estimate

$300,000 – $800,000

The project involves a full lift‑station rebuild, concrete work, extensive piping, electrical systems, and a standby generator. Based on comparable municipal lift‑station projects in Kansas, total construction costs typically range from $300,000 to $800,000 depending on site conditions, material prices, and equipment specifications. Therefore, the contractor’s net earnings (assuming a 10‑15% profit margin) would likely fall between $30,000 and $120,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Mandeville·Louisiana

Top match · 72%

ITB: LIFT STATION 28, G, & H UPGRADES; C.O.M. PROJECT NO.: 212.25.001

Closes 11/24/2026Opened 10/28/2026

City of Wilton Manors·Florida

71% match

Lift Station No. 1 Replacement

Closes 11/2/2026Opened 9/30/2026

City of Frazee, MN·Minnesota

71% match

2026 Sanitary Lift Station Improvements - Main Ave E & 2nd Street SW

Closes 11/18/2026Opened 10/16/2026

League City·Texas

71% match

Landing Blvd Lift Station Rehab WW1901F

Closes 11/3/2026Opened 10/2/2026

City of Lino Lakes·Minnesota

71% match

Lift Station #53 Rehabilitation

Closes 11/5/2026Opened 10/14/2026

City of League City·Texas

70% match

Landing Blvd Lift Station Rehab WW1901F

Closes 11/3/2026Opened 10/2/2026

Louisiana City of Mandeville·Louisiana

70% match

LIFT STATION 28, G, & H UPGRADES; C.O.M. PROJECT NO.: 212.25.001

Closes 11/25/2026Opened 10/14/2026

City of DeLand·Florida

70% match

Lift Station #10 Relocation

Closes 11/18/2026Opened 10/13/2026

City of Wilton Manors·Florida

70% match

Lift Station No. 7 Replacement

Closes 11/23/2026Opened 10/22/2026

City of Orlando·Florida

70% match

Lift Station No. 85 Replacement

Closes 12/4/2026Opened 10/26/2026

City of Austin·Texas

69% match

Gregg Manor Subdivision Lift Station (SER-5219R2)

Rolling / TBD closeOpened 8/3/2026

U.S. Department Of Health And Human Services·South Dakota

69% match

Rosebud Lift Station Construction

Closes 12/1/2026Opened 10/27/2026

City of Laguna Beach·California

69% match

Old Top of the World Lift Station Rehabilitation - Phase II

Closes 11/10/2026Opened 10/9/2026

City of Opa-locka·Florida

68% match

Sewer Infrastructure Improvement Project: Lift Station No. 4 to York Street Lot 25

Closes 11/13/2026Opened 10/14/2026

Manatee County - Purchasing Division·Florida

68% match

LIFT STATION 9-A FORCE MAIN EXTENSION

Closes 11/20/2026Opened 10/9/2026

City of Phoenix·Arizona

68% match

LIFT STATION 47 - REDUNDANT FORCE MAIN DESIGN-BID-BUILD

Closes 11/10/2026Opened 10/15/2026

City of Wilton Manors·Florida

68% match

Lift Station No. 4 Replacement

Closes 11/10/2026Opened 10/8/2026

City of West Palm Beach·Florida

68% match

Flagler Drive Lift Station Retrofits (Lift Station No. 3 and Lift Station No. 40)

Closes 11/30/2026Opened 10/22/2026

Village of Cary·Illinois

68% match

Foxford Hills Lift Station No. 1 Partial Rehabilitation - Level Controls, Rails, Valves and Control Enclosure

Closes 11/9/2026Opened 10/15/2026

City of Hilliard, Ohio·Ohio

67% match

Heritage Lakes No 1 Lift Station Replacement (CIP S-48)

Closes 11/19/2026Opened 10/29/2026

City of Lawrence·Kansas

67% match

MS-220015A Lawrence Pump Station 9 Improvements

Closes 12/8/2026Opened 10/27/2026

Ramsey County·Minnesota

67% match

Gottfried Pit/Larpenteur Lift Station - Replacement Panel

Closes 11/12/2026Opened 10/14/2026

City of Seabrook·Texas

67% match

CSB# 2026-17-359 MAIN STREET LIFT STATION DBS (DRI-PRIME BACKUP SYSTEM)

Closes 11/3/2026Opened 10/14/2026

City of Branson·Missouri

67% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

Johnson County Wastewater·Kansas

67% match

Notice - Progressive Design Build (PDB) Services for the Brush Creek Pump Station Improvements

Rolling / TBD closeOpened 11/4/2026