The project involves the construction of a traditional breakpoint nutrient reduction wetland in Floyd County, Iowa. The work includes selective clearing, excavation, grading, steel sheetpile installation, tile installation, water control structure, and seeding. The project requires the installation of approximately 16,036 cubic yards of earthwork, 1,063 square feet of steel sheetpile, 1,985 linear feet of tile, and 13.3 acres of seeding. The estimated construction cost range for this project is $350,000 to $450,000.
• The project includes site preparation, excavation, and installation of steel sheetpile and tile.
• The project requires the installation of a water control structure and seeding of the area.
• The project includes the removal of existing material, disposal of refuse, and salvage of items.
• The project requires the application of erosion control measures, including seeding and mulching.
• The project includes the installation of geotextile and riprap for erosion control.