The City of Ann Arbor is seeking a qualified contractor to design‑build and construct new sidewalks, curb‑and‑gutter, retaining walls, storm‑water pipe installations, and associated traffic‑control, landscaping, and erosion‑control improvements along Dexter Road. The work is divided into two phases with hard completion dates and includes detailed specifications for concrete, asphalt, utility adjustments, tree removal, and turf restoration. The contract will be awarded to the highest‑scoring responsive bidder and will require extensive documentation (prevailing‑wage, living‑wage, conflict‑of‑interest, non‑discrimination) and performance bonds.
• New sidewalks, curb‑and‑gutter, and detectable‑warning surfaces from STA 24+50 to STA 47+88 (Phase 1) and from STA 8+60 to STA 24+50 (Phase 2).
• Installation of 12‑in. and 18‑in. reinforced concrete storm‑water pipe, inlets, and related structures, plus water‑main and curb‑box work.
• Site preparation, tree and brush removal, erosion‑control measures (check dams, silt fence, tree‑protection fencing), and turf restoration with topsoil, seeding, and mulch blankets.
• Detailed traffic‑control plans, temporary and permanent signage, pedestrian‑signal foundations, and lighting pole foundations.