Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Civil Engineering
  5. ›RFQ&P for HH-1020 Moccasin Dam and Reservoir Long-Term…

San Francisco Water Power Sewer·California

RFQ&P for HH-1020 Moccasin Dam and Reservoir Long-Term Improvements

Closes 7/15/2026
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City and County of San Francisco (the “City”), acting by and through the San Francisco Public Utilities Commission (“SFPUC”), is soliciting Proposals from qualified firms to provide Construction Management / General Contractor services for Contract No. HH 1020 – Moccasin Dam and Reservoir Long-Term Improvements Project using the Construction Manager / General Contractor project delivery method.Digital files of the Request for Qualifications and Proposals (“RFQ&P”) package are available by request. To request these materials, email [email protected] with this Contract No. HH-1020, the firm name, full address, email address, phone number, copy of contractor’s license or business card, and a copy of a government-issued identification. Visit https://webapps.sfpuc.org/bids/ for updates. Please be advised that prior to receiving these materials, all requestors will be required to complete, sign, and comply with a Confidentiality Agreement.The Project is an integral part of the Hetch Hetchy Water and Power water supply system (Hetch Hetchy system). The main purpose of the Hetch Hetchy system is to convey raw drinking water from Hetch Hetchy Reservoir to the San Francisco Bay Area. This conveyance is achieved through a combination of reservoirs, pipelines, and tunnels. Moccasin Reservoir is located directly downstream of the last of the three powerhouses of the Hetch Hetchy system, directly over Moccasin Creek. On March 22, 2018, a severe storm caused a flood surge and damaged various infrastructure. The Project includes modifying the approach upstream of the ogee-crested weir, enlarging/modifying the ogee-crested weir, new concrete bridge, new concrete spillway chute, enlarged stilling basin, and other work as detailed in this RFQ&P.Each Applicant must have a Class “A” California Contractor’s license which is current, active, and in good standing with the California Contractors State License Board (CSLB), on the date and time the Qualification Application is submitted and must submit this Qualification Application with all portions completed, including required attachments.The Applicant must (1) retain trade subcontractors for pre-construction work and construction work who have a California Contractor’s license which is current, active, matches with the Work being performed, and is in good standing with the CSLB, on the date and time the Work is performed and (2) have a Qualifying Individual on staff who has a current active California Contractor’s License to manage the required construction work.Due to the unique complexities of the design and construction required for this Project, the City has determined that the Project requires specialized expertise and skill, which should be procured with an alternate delivery method to traditional design-bid-build. The City has selected the Construction Manager / General Contractor project delivery method (“CM/GC Delivery”) in accordance with San Francisco Administrative Code Section 6.68(b)(3) CM/GC Team Best Value Procurement.The Proposer is the lead entity responding to this RFQ&P. A Proposer may be either an individual Prime Proposer or a Joint Venture (JV). The selected Proposer is referred to herein as the Contractor. The term CM/GC as used herein, when not referring to the delivery method, can apply to either a Proposer or the Contractor, depending on the context. The CM/GC Team is comprised of (a) the CM/GC and (b) CM/GC’s two Core Trade Subcontractors. The selected CM/GC Team will engage in pre-construction services to provide expertise to the City-led design team composed of SFPUC staff and design consultants (collectively hereinafter referred to as “A/E Team”) to complete the design process and, if authorized, perform construction services to deliver the Project, meeting SFPUC’s quality goals, schedule, and budget.The Local Business Enterprise (“LBE”) participation requirement for this Project is 12% of the Contract Sum.A RFQ&P Pre-Submittal Conference will be held in person and as a teleconference on Tuesday, May 12, 2026, at 10:00 A.M. PDT (https://www.time.gov) at Mod 7 Building in Moccasin, CA (37.8069748, -120.2966103 and refer to map at https://sfpuc.sharefile.com/public/share/web-sc1f6435005af47f8ab6b1a518d715e0c and at https://sfwater.zoom.us/j/88380783720?pwd=81YWSZaQWgx8N2EnkdqMm5WM0V5QTW.1 or by dialing 1-669-219-2599, Meeting ID 883 8078 3720 and Passcode 251370 (hit # after each). It will be followed by a Site Inspection at 11:30 A.M. starting from that same in-person location.A Site Inspection is scheduled for Tuesday, May 12, 2026, at 11:30 A.M. and will be limited to six team members from each of the CM/GC Teams (including any subcontractors or suppliers). SFPUC will provide more details at the Pre-Submittal Conference. Please rsvp to [email protected]. Each visitor must have a hard hat and safety shoes.Written questions regarding the RFQ&P shall be directed to [email protected] no later than 2:00 P.M. on Monday, July 6, 2026.Respondents must submit their required written submittals (Application and Proposal) via upload in response to the RFQ&P no later than 2:00 P.M. on Wednesday, July 15, 2026.Funding for this project may be provided in full or in part by the Corps Water Infrastructure Financing Program (“CWIFP”), a federal credit program administered by the U.S. Army Corps of Engineers (“Corps”) for eligible water and wastewater infrastructure projects. The contents of this document do not necessarily reflect the views and policies of the foregoing, nor does mention of trade names or commercial products constitute endorsement or recommendation for use. This RFQ&P contains State and Federal requirements that the Contractor and its subcontractors must follow to meet the CWIFP requirements. For more information, refer to Section 00 48 10.01 in Appendix I. In addition to the CWIFP, work to be performed under this contract may be in full or in part financed by the Water Infrastructure Finance and Innovation (“WIFIA”).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
4/20/2026
Closes
7/15/2026

Last updated

Details

Industry
Civil Engineering
NAICS
237990

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

San Francisco Water Power Sewer·California

Top match · 74%

RFQ for HH-1018 Moccasin Powerhouse Bypass Upgrade

Closes 11/19/2026Opened 9/23/2026

City of Pomona·California

68% match

RESERVOIR NO. 2C REPAIRS AND SAFETY IMPROVEMENTS FD528 – CC8125 – PROJECT WORKTAG 95082

Closes 11/18/2026Opened 10/8/2026

North Central Missouri Regional Water Commission·Missouri

67% match

REBID NCMRWC Roy Blunt Multi-Purpose Reservoir

Closes 11/5/2026Opened 10/15/2026

The City of Columbus·Ohio

67% match

RFQ033855 - Hoover Dam Improvements Pt. 2

Closes 12/9/2026Opened 10/16/2026

U.S. Department Of Defense·Kentucky

67% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

Kansas Department of Wildlife and Parks·Kansas

66% match

Pratt Water System Improvements

Closes 11/10/2026Opened 10/12/2026

Imperial Irrigation District·California

66% match

East Highline Reservoir Project

Closes 12/2/2026Opened 9/10/2026

U.S. Department Of The Interior·New Mexico

66% match

C--BGNDRF PIPING UPGRADES

Closes 11/13/2026Opened 10/7/2026

City of Columbus Ohio·Ohio

66% match

Hoover Dam Improvements – Part 2

Closes 12/9/2026Opened 10/14/2026

State of Michigan – Department of Technology, Management and Budget (DTMB)·Michigan

66% match

751/26331.SAA; Hadley SRA - Minnawanna Dam Improvements

Closes 12/2/2026Opened 10/19/2026

Georgia Macon Water Authority·Georgia

65% match

AWTP-(2) 1000 Hp Reservoir Vertical Turbine

Closes 11/17/2026Opened 10/2/2026

Ohio Department of Natural Resources·Ohio

65% match

Cowan Lake Dam Improvements

Closes 11/6/2026Opened 10/2/2026

Texas Midwestern University·Texas

65% match

RFP Tunnel Surface Improvement Project

Closes 11/12/2026Opened 10/14/2026

Massachusetts Department of Fish and Game·Massachusetts

65% match

DFW-2027-006 Roger Reed Generator Improvements

Closes 11/25/2026Opened 9/9/2026

Nevada Government·Nevada

65% match

SWRF Condition Assessment and Rehabilitation

Closes 11/5/2026Opened 10/13/2026

City of Santa Rosa·California

65% match

Bennett Valley Golf Course Irrigation System Improvements

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of The Interior·Utah

65% match

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/4/2026

U.S. Department Of Defense·Texas

65% match

RFI: Fort Wolters H Barracks

Closes 11/4/2026Opened 10/21/2026