Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›EAST CANAL EFFICIENCY IMPROVEMENTS

U.S. Department Of The Interior·Utah

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026$5M – $15MInvitation for Bid
Get bids like this by emailBid source

Description

The Bureau of Reclamation is soliciting sealed bids for the design‑build construction of water‑efficiency improvements to the East Canal in the Upper Colorado Region. The scope includes mobilization, removal of existing structures, extensive earthwork, installation of a new 4,200‑ft 36‑in HDPE diversion pipeline with inlet/outlet concrete structures, construction of a side‑channel spillway, double‑barrel siphon, ramp flume, GK check structure, miscellaneous metal work, and associated valve, pipe, and appurtenances. Work must commence within 21 calendar days of award and be completed by November 1 2028 under a firm‑fixed‑price contract. Bidders must provide performance and payment bonds and meet a minimum 60‑day government acceptance period. • Solicitation ID: 140R4026R0025 (IFB) • Issued: 09/25/2026; Offer due: 11/20/2026, 1300 local time • Period of performance: 01/25/2027 – 11/01/2028 (≈19 months) • Location: Upper Colorado Region, project work in Colorado (delivery point Grand Junction, CO) • Primary contact: Tyler Spencer, (801) 524‑3653, [email protected] • NAICS: 237110 – Water and Sewer Line & Related Structures Construction • Contract type: Firm Fixed Price, sealed bid, mandatory performance bonds • Estimated scope: ~4,200 ft HDPE pipeline, concrete structures, earthwork, spillway, siphon, flume, metalwork, valve & pipe installation.

Attached files

Contact

Tyler Spencer(Contracting Officer)

[email protected]

(801) 524-3653

Key dates

Opened
9/4/2026
Site visit
10/13/2026
Closes
11/20/2026
Duration
19 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
140R4026R0025

Budget estimate

$5,000,000 – $15,000,000

The solicitation does not disclose a contract ceiling. Based on the extensive scope—~4,200 ft of 36‑in HDPE pipe, multiple concrete structures, earthwork, and ancillary systems—a typical water‑infrastructure project of this size in the western U.S. ranges roughly from $5 million to $15 million. The lower bound assumes minimal unit rates and limited contingencies; the upper bound reflects higher material costs, labor rates, and potential schedule extensions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of The Interior·Colorado

Top match · 94%

Y--EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/25/2026

Imperial Irrigation District·California

85% match

East Highline Reservoir Project

Closes 12/2/2026Opened 9/10/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

82% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Kansas Department of Wildlife and Parks·Kansas

81% match

Pratt Water System Improvements

Closes 11/10/2026Opened 10/12/2026

City of Thornton·Colorado

81% match

New Union Ditch Concrete Channel Conversion and Headgate

Closes 11/5/2026Opened 10/1/2026

North Carolina Orange Water & Sewer Authority·North Carolina

81% match

Construction

Closes 11/10/2026Opened 10/19/2026

North Carolina Orange Water and Sewer Authority·North Carolina

81% match

Jones Ferry Road WTP Rapid Mix Improvements

Closes 12/3/2026Opened 10/27/2026

U.S. Department Of Defense·California

81% match

BRINE PIPELINE ACCESS IMPROVEMENTS

Closes 2/4/2027Opened 8/12/2026

North Carolina Orange Water and Sewer Authority·North Carolina

81% match

Gravity Sewer Creek Crossing Upgrades

Closes 11/10/2026Opened 9/21/2026

El Paso Water·Texas

81% match

Northeast Water & Wastewater Utility Improvements Program – Work Package 1, 3, 4, & 6

Closes 11/13/2026Opened 10/26/2026

CPPJ- Special Service Districts·Louisiana

81% match

Nelson Road Waterline Expansion Project

Closes 11/17/2026Opened 10/20/2026

City of Columbus·Ohio

81% match

Hoover Dam Improvements Pt. 2

Closes 11/18/2026Opened 10/13/2026

Town of Bennington·Vermont

81% match

TOWN OF BENNINGTON BENNINGTON, VERMONT WATER RESOURCES DIVISION MONUMENT AVENUE EXTENSION DWSRF RF3-559

Closes 11/19/2026Opened 10/6/2026

Ohio Department of Natural Resources·Ohio

81% match

Cowan Lake Dam Improvements

Closes 11/6/2026Opened 10/2/2026

Town of Waterford·Connecticut

81% match

REPLACEMENT OF EXISTING PLASTIC WATER SERVICES WITH NEW COPPER WATER SERVICES FY27 ROPE FERRY ROAD (STATE ROAD)

Closes 11/12/2026Opened 10/16/2026

City of Austin·Texas

80% match

Lower Fort Branch Basin - Wastewater Pipeline Renewal

Rolling / TBD closeOpened 10/5/2026

City of Redlands·California

80% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of Columbus Ohio·Ohio

80% match

OSU Innovation District Waterline Extension

Closes 11/18/2026Opened 10/26/2026

City of Ontario·California

80% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

City of Cincinnati·Ohio

80% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 11/12/2026Opened 9/17/2026

Goodwyn Mills Cawood·Georgia

80% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

Town of Camp Verde·Arizona

80% match

Park Verde Road Irrigation Crossing Improvements Project

Closes 11/3/2026Opened 10/8/2026

Western Virginia Water Authority·Virginia

80% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

Mississippi

80% match

2020 Water Distribution System Additions

Closes 11/4/2026Opened 10/30/2026

Town of Cutler Bay·Florida

80% match

Old Cutler Commons UN1 & UN2 Sub-Basins Water Quality Improvement Project

Closes 1/13/2027Opened 10/23/2026