The Arizona Game and Fish Department is seeking a contractor to design‑build a new boating facility at Parker Canyon Lake, including a concrete boat ramp, dock, gangway, vault toilet, access road, sidewalks, curbs, drainage, lighting, and related site work. The scope covers clearing and grubbing, grading, paving, installation of a vault toilet, dock and gangway, construction of a concrete boat ramp, and compliance with Build America, Buy America Act requirements. Work cannot be performed between May 24 and September 30 2026 due to breeding‑season restrictions, with construction anticipated to start October 1 2026. The contract value is estimated at $1.5 million, with a 365‑day performance period.
• Comprehensive civil‑construction scope: excavation, grading, fill, rock mulch, rip‑rap, concrete structures (boat‑ramp slabs, catch basins, headwalls), CMU retaining wall, handrail, accessible restroom, trail, and solar‑powered streetlighting.
• Mandatory compliance: BABAA (Buy America) two‑pricing sets, environmental protection (plant‑species notice, wildlife monitoring), and strict waste‑disposal requirements.
• Procurement details: IFB with bid due September 30, 2026 via Arizona Procurement Portal (APP), 10 % bid bond, 100 % performance and labor bonds, 90‑day offer validity, and a 2‑year warranty on labor/materials.