The Michigan Department of Technology, Management, and Budget is seeking a contractor to rehabilitate the Winchester Dam in Mecosta County. The project involves repairs to the primary spillway, auxiliary spillway, and embankment, as well as the installation of a new stoplog sealing system and locking mechanism. The contractor will also be responsible for excavations, concrete work, and the installation of a toe drain system. The project requires compliance with environmental regulations and permits.
• The primary spillway will undergo concrete repairs, and a new stoplog sealing system and locking mechanism will be installed.
• The auxiliary spillway will be reconstructed with a new concrete crest and stem walls, and a heavy riprap-lined channel will be installed.
• The embankment will be upgraded with a new downstream toe drain and granular filter installation.
• The project requires the use of geotextile fabric, bedding stone, and drainage stone.
• The contractor must comply with environmental regulations and obtain necessary permits.
• The project involves the excavation and removal of existing materials, as well as the installation of new concrete, steel, and drainage systems.
The project is expected to require a significant amount of labor, materials, and equipment, and the contractor must have experience with similar projects to ensure successful completion.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.