The Newark Public Schools is seeking a design‑build or prime contractor to demolish and reconstruct the existing swimming pool at the Chancellor Avenue Annex School and to provide all associated architectural, structural, mechanical, electrical, plumbing, civil, and environmental services. The scope includes complete demolition of the current pool, construction of a new 1,200 sf in‑ground pool with supporting deck, installation of filtration, heating, de‑humidification, and chemical‑control systems, new plumbing and electrical distribution, site grading, concrete work, and finish‑grade slip‑resistant surfaces, all in compliance with the 2021 NJ International Building Code. The project will require coordination among multiple engineering disciplines and coordination with equipment manufacturers (PENTAir, Hayward, etc.).
• Demolition of existing pool, deck, basement finishes, and associated MEP fixtures.
• New pool construction (22 ft × 18 ft, 150‑person capacity) with concrete deck, coping, and MARCITE plaster finish.
• Full MEP package: dual sand‑filters, gas heater, AHUs with de‑humidifiers, chemical‑control system, pool lighting, and bonding per NEC 680.
• Civil/site work: equipment pads, grading, drainage, expansion joints, and utility connections.
• Structural upgrades: reinforced concrete slab, new steel lintels, epoxy‑coated reinforcement.