The University of Alaska Fairbanks is seeking a qualified contractor to renovate the Ernest N. Patty Center swimming pool and associated facilities. The work includes extensive architectural, structural, mechanical, electrical, civil, and code‑correction modifications, demolition of existing pool equipment, removal of hazardous materials (asbestos, lead‑based paint, PCBs), installation of new filtration, chemical‑treatment, HVAC/HRV systems, and a building addition for an HRV. The project also incorporates several optional alternates for guard‑rail upgrades, pool‑vessel penetrations, and filtration upgrades, and requires strict compliance with Alaska building codes, fire‑protection, and prevailing‑wage regulations.
• Full‑scope renovation of the pool building envelope, structural supports, and interior finishes.
• Replacement of pool circulation, filtration, heating, and chemical‑treatment equipment with new pumps, VFDs, NEXGEN chlorination system, and associated controls.
• Removal and remediation of identified hazardous materials, installation of new fire‑sprinkler (wet‑pipe) system, and coordination of new electrical power distribution, lighting, and addressable fire‑alarm systems.