Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›BNR Walkway Structural Improvements

SacSewer·California

BNR Walkway Structural Improvements

Closes 9/30/2026$250k – $300kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Sacramento Area Sewer District (SAC Sewer) is soliciting bids for structural upgrades to the cantilevered walkway at the EchoWater Resource Recovery Facility. The scope includes installing nine stainless‑steel hollow structural (HSS) bracing brackets, pre‑scanning the existing walkway to avoid reinforcing steel, drilling epoxy‑anchor holes, and completing all associated metal‑work, welding, and finishing. The contractor must hold a California General Engineering Contractor Class A license, provide a 10 % bid bond, and supply performance and payment bonds equal to the contract price. A mandatory pre‑bid conference and walk‑through will be held on September 17, 2026; all bidders must register their attendance two days in advance. The estimated contract value is $280,000, with bid submission due by September 30, 2026. The District will award the contract to the lowest responsible bidder, with award expected within 30 days after opening. • Required license: General Engineering Contractor – Class A • Mandatory pre‑bid conference (Sept 17) • Estimated cost: $280 k • Scope: install 9 stainless‑steel HSS brackets, epoxy anchoring, welding, passivation, final cleaning • Bonds: 10 % bid bond; 100 % performance & payment bonds • Deadline: Sept 30, 2026 (2 PM EDT) • Site: EchoWater Resource Recovery Facility, Elk Grove, CA

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Thomas Ullensvang(Bid Contact)

[email protected]

(000) 000-0000

Key dates

Opened
9/2/2026
Pre-bid meeting
9/17/2026Mandatory
Closes
9/30/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
10000087

Budget estimate

$250,000 – $300,000

The solicitation lists an estimated contract cost of $280,000. Assuming typical contractor overhead and profit (≈10‑15 %) and possible change‑order allowances, the total budget to the winning contractor is likely to fall between $250,000 and $300,000. Factors influencing the range include the final bid price, any approved change orders, and the cost of required bonds and insurance.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

New York City Department of Environmental Protection·New York

Top match · 64%

82627B0022-BEDC-NR-107 Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

Charleston County·South Carolina

64% match

Road Work - Riverland Drive (S-53) Pedestrian Improvements & Central Park Road (S-67) Roadway Improvements

Closes 12/1/2026Opened 10/30/2026

NYS East Fishkill, Town of·New York

64% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

BREC·Louisiana

63% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

City of Richmond Government·Virginia

63% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

City of Hampton·Virginia

63% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

Illinois Tollway·Illinois

62% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

Louisiana Recreation and Park Commission for the Parish of East Baton Rouge·Louisiana

62% match

Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

City of Vernon·California

62% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

City of Charlotte·North Carolina

62% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

New York City Department of Environmental Protection·New York

62% match

82627B0022-BEDC-NR-107: Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

Town of Bluffton·South Carolina

62% match

Pathway Pedestrian Improvements Phase 3

Closes 11/12/2026Opened 10/13/2026

Town of Westwood·Massachusetts

62% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

Recreation and Park Commission for the Parish of East Baton Rouge (BREC)·Louisiana

62% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 10/1/2026

City of Harrisonburg·Virginia

62% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

NYS Cambria, Town of·New York

61% match

Baer Road Culvert Over East Branch of Twelve Mile Creek

Closes 11/5/2026Opened 10/9/2026

Delaware River Joint Toll Bridge Commission·New Jersey

61% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

City of Fond du Lac·Wisconsin

61% match

MIXED LIQUOR SPLITTER STRUCTURE IMPROVEMENTS

Closes 11/18/2026Opened 10/14/2026

Miami-Dade County·Florida

61% match

International Gardens Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

City of Elk Grove·California

61% match

Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project

Closes 11/17/2026Opened 10/15/2026

Virginia Department of Transportation·Virginia

61% match

B13_2027 PEDESTRIAN AND ROAD IMPROVEMENTS

Closes 11/18/2026Opened 10/27/2026

City of Douglas·Wyoming

61% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

City of Richmond·Virginia

60% match

US 60 Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/2/2026Opened 10/23/2026

LA Public Works Engineering Bureau·California

60% match

CENTRAL AVENUE PEDESTRIAN IMPROVEMENTS & CENTRAL AVENUE STREETSCAPE IMPROVEMENTS FEDERAL NO. CML-5006(896) & FEDERAL NO.

Closes 12/9/2026Opened 10/28/2026

City of Oakland·California

60% match

TELEVISION & PRODUCTION EQUIPMENT AND ACCESSORIES - 840.86 VIDEO SYSTEMS

Closes 11/19/2026Opened 10/23/2026