Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›RENOVATE RUNWAY CONTROL STRUCTURE B1776

U.S. Department Of Defense·Texas

RENOVATE RUNWAY CONTROL STRUCTURE B1776

Closes 9/22/2026$5M – $15MRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Air Force is seeking a design‑build contractor to fully renovate and modernize the Runway Control Structure (Building 1776) at Laughlin AFB, Texas. The effort includes structural steel realignment, masonry repair, roof weatherproofing, interior reconfiguration, HVAC ductwork replacement, electrical upgrades, new cabinetry, carpet replacement, and associated site‑specific requirements such as hazardous‑material handling, airfield driving compliance, and FAA approvals. The contractor must provide 100 % design documentation before construction, manage all permitting, conduct a mandatory site visit, and adhere to a 352‑day performance period divided into design, material, and construction phases. • Design‑build scope covering structural, architectural, mechanical, electrical, and specialty equipment upgrades. • Required 100 % design approval prior to construction start. • Mandatory site visit on 8 Sept 2026; attendees must be submitted by 4 Sept 2026. • Questions due 14 Sept 2025; no pre‑bid meeting listed. • Three Notices‑to‑Proceed: 217 days (design), 90 days (materials), 45 days (construction). • Project located within a Controlled Movement Area; extensive airfield safety and training requirements. • Small‑business set‑aside (100 %); NAICS 236220. • Total Period of Performance: 352 calendar days. • Contractor serves as “Designer of Record” and must be SAM‑registered.

Attached files

Contact

Tyler Adamich

[email protected]

(830) 298-4861

Key dates

Opened
9/10/2026
Questions due
9/14/2025
Pre-bid meeting
9/8/2026
Site visit
9/8/2026Mandatory
Closes
9/22/2026
Duration
352 days

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
236220
Solicitation №
FA309926Q0021

Budget estimate

$5,000,000 – $15,000,000

The solicitation does not disclose a contract value. Based on the extensive scope—full structural rehab, HVAC, electrical, interior finishes, hazardous‑material mitigation, and the 352‑day schedule for a military runway control building—similar DoD renovation projects typically range from $5 million to $15 million. The lower end assumes minimal unforeseen conditions; the upper end accounts for higher labor rates, specialty equipment, and contingency for hazardous‑material handling.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Delta Airport Consultants·Virginia

Top match · 73%

COMING SOON - Roanoke, VA - Roanoke-Blacksburg Reg. Airport - Rehabilitate Runway 6-24 (24072)

Rolling / TBD closeOpened 5/1/2026

City of Mankato·Kansas

72% match

Mankato Airport (TKO) | 24434

Closes 11/19/2026Opened 10/31/2026

Raleigh Durham Airport Authority·North Carolina

71% match

Runway 5R-23L and T1 Apron Pavement Rehabilitation

Closes 11/9/2026Opened 9/30/2026

Port of Portland·Oregon

71% match

Portland International Airport North Runway Rehabilitation

Closes 11/12/2026Opened 10/15/2026

Niagara Frontier Transit Authority (NFTA)·New York

70% match

12NA2603 - NFIA – Taxiway J East Approach Removal

Closes 11/17/2026Opened 10/6/2026

Delta Airport Consultants·New Jersey

70% match

COMING SOON - Morristown, NJ - MMU - Improve RSA Runway 5-23, PH. XI (25006)

Rolling / TBD closeOpened 4/1/2026

Raleigh Durham Airport Authority·North Carolina

70% match

Taxiway J Rehabilitation

Closes 11/30/2026Opened 10/26/2026

City of Charlotte·North Carolina

69% match

FBO Apron Expansion & Rehab

Rolling / TBD closeOpened 10/13/2026

City of Charlotte·North Carolina

69% match

Runway 18/36 and Taxiway Delta Rehab Construction

Rolling / TBD closeOpened 12/14/2026

Little Rock Municipal Airport Commission·Arkansas

69% match

4R-22L RUNWAY AND TAXIWAY LIGHTING REHABILITATION

Closes 11/18/2026Opened 10/11/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

68% match

Runway 13/31 Safety Area & RPZ Improvements - Phase III Demolition

Closes 11/17/2026Opened 10/16/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge (Greater Baton Rouge Airport District)·Louisiana

68% match

Runway 13/31 Safety Area & RPZ Improvements - Phase III Demolition

Closes 11/17/2026Opened 10/13/2026

Delta Airport Consultants·Pennsylvania

68% match

COMING SOON - Tobyhanna, PA - Pocono Mtns. Reg. Airport - Rehabilitate Runway 5-23 (24084)

Rolling / TBD closeOpened 3/1/2026

Hillsborough County Aviation Authority·Florida

68% match

GENERAL AVIATION APRON REHABILITATION (TPA)

Closes 11/16/2026Opened 9/29/2026

Delta Airport Consultants·Pennsylvania

68% match

COMING SOON - Clearfield-Lawrence Airport - Install Runway 12-30 Visual NAVAIDs-PAPI (24074)

Rolling / TBD closeOpened 10/22/2026

Delta Airport Consultants·Virginia

68% match

Farmville, VA - Farmville Regional Airport - Replace RW 3-21 PAPI'S (24062)

Rolling / TBD closeOpened 10/22/2026

City of Charlotte·North Carolina

67% match

Terminal Roof and AHU Replacements

Closes 1/1/2027Opened 8/12/2026

Texarkana Regional Airport·Arkansas

67% match

Texarkana Regional Airport – Restore and Reseal Exterior Wood Surfaces

Rolling / TBD closeOpened 9/20/2026

NYS Niagara Frontier Transportation Authority·New York

67% match

NFIA – Runway 10-28 Rehabilitation (Designs)

Closes 11/3/2026Opened 10/2/2026

San Joaquin County·California

67% match

Stockton Metropolitan Airport (SCK) Access Control System Assessment, Upgrade, Consulting, and Maintenance

Closes 12/18/2026Opened 10/30/2026